BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 24, 2026

Renovation of a military facility in Fort Leavenworth, Kansas. Completed plans call for the renovation of a military facility.

Provide all labor, materials, equipment, supervision, and related services necessary for the complete demolition and replacement of the existing machine-room-less (MRL) elevator, including all associated equipment and supporting structures. Record drawings from the most recent renovation and elevator repair work will be provided. The replacement elevator shall be a fully non-proprietary system to ensure future maintenance and repair services can be performed by any qualified elevator technician without reliance on proprietary manufacturer support. The new elevator shall be installed as a hydraulic, holeless, roped, single-jack, cantilever passenger elevator with a 4,500-pound capacity. The elevator shall provide three front openings, 24 feet 3 inches of travel, and an operating speed of 100 feet per minute. All work shall comply with ANSI A17.1-2016 requirements and all applicable industry standards, codes, and regulations. Question cut off date no later than 2:00pm CST on 25 August 2026 to jennifer.s.walker12.civ@army.mil. The Magnitude of Construction is Provided $500,000 to $1,000,000. The Contractor Shall Begin Performance Within 10 Calendar Days and Complete It Within 200 Calendar Days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN -W91QF426IFBELEvator

Sub-Bidding

$1,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
59
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

October 8, 2026

Project location map

731 McClellan Ave, Fort Leavenworth, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.