BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 15, 2026

Renovation of a transportation facility in New Castle, Delaware. Completed plans call for the renovation of a transportation facility.

This project consists of a Base Bid and five (5) Additive Alternates, which may be awarded at the sole discretion of the Authority. Work generally consists of, but is not limited to, furnishing all labor, materials, and equipment necessary for the removal, replacement, and installation of HVAC equipment serving Hangar 2 at Wilmington Airport. generally consists of, but is not limited to, furnishing all labor, materials, and equipment necessary for the removal, replacement, and installation of HVAC equipment serving Hangar 2 at Wilmington Airport. Work will include, but not be limited to, exterior duct work, cleaning of interior duct work, testing and balancing, new circuitry for new HVAC equipment, installation of a gas detection system, installation of duct smoke detectors, sprinkler modifications, and installation of natural gas piping. Additive Alternate No. 1 , Additive Alternate No. 2, and Additive Alternate No. 3 Work consists of, but is not limited to, furnishing all labor, materials, and equipment necessary for the removal , replacement, and installation of HVAC equipment serving Hangar 2 at Wilmington Airport. Work will include, but not be limited to, exterior duct work, cleaning of interior duct work, testing and balancing, new circuitry for new HVAC equipment, installation of a gas detection system, installation of duct smoke detectors, sprinkler modifications, and installation of natural gas piping. Additive Alternative No. 1 Work is located on the FirstFloor East Side, Additive Alternate No. 2 Work is located on Second Floor West Side, and Additive Alternate No. 3 Work is located on the Second-Floor East Side of Hangar 2. Additive Alternate No. 4 Work consists of, but is not limited to, furnishing all labor, materials , and equipment necessary for the installation of Ventilation Systems in Hangar Bay 2A. Work will include, but is not limited to, removing abandoned equipment, installation of exhaust fans, installation of roof vents, installation of HVAC equipment, and new circuitry for the new HVAC equipment. Additive Alternative No. 5 Work consists of, but is not limited to, furnishing all labor, materials, and equipment necessary for the installation of Ventilation Systems in Hangar Bay 2B. Work will include, but is not limited to, removing abandoned equipment, installation of exhaust fans, installation of roof vents, installation of HVAC equipment, and new circuitry for the new HVAC equipment. The Contractor is responsible for obtaining and maintaining all required construction permits, including building construction permits for the project prior to construction through issuance of the Certificate of Occupancy. No less than ten (10) business days prior to the permits becoming necessary for the project work, the Contractor shall request hard copy plans for permitting purposes from the design engineer and architect (i.e., the bid set of plans), who will send the plans to the Contractor via UPS. Question Deadline 08/24/2026 Any questions, clarifications, or requests for revisions to the Contract Documents must be forwarded to t he Authority in writing Online.

GC Bidding

$1,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
790
Active Projects
308
Bidding Soon
4,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

November 1, 2026

Project location map

151 N Dupont Hwy, New Castle, DE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.