BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 18, 2026

Site work for a water / sewer project in Chimayo, New Mexico. Completed plans call for site work for a water / sewer project.

Replacement of the existing floating courtesy dock, including all labor, materials, equipment, transportation, supervision, and incidentals necessary to remove, furnish, and install a new floating courtesy dock in accordance with the performance work statement. Work shall include all associated components, connections, and site-related activities required to provide a fully functional dock system. The contractor shall provide a technical approach and project schedule demonstrating the ability to meet the required delivery and completion timeframe. All work shall be performed on a firm-fixed-price basis and completed within 90 days after issuance of the Notice to Proceed. Period of Performance: 09/04/2026 to 12/04/2026 Location: Santa Cruz Lake Recreation Area (SCLRA), Santa Fe County, New Mexico. Provide your feedback on BizChat The Bureau of Land Management (BLM ) - Taos Field Office (TFO) will replace a floating courtesy dock at the Santa Cruz Lake Recreation Area (SCLRA). The current dock is in poor condition and requires repairs. Each winter, the dock is removed from the lake. Because it does not have wheels, it must be dragged across the concrete boat ramp and asphalt parking lot for storage. This project includes furnishing, delivery, installation, and on-site Operations & Maintenance (O&M ) training for BLM staff. 3.1.1. Offeror must furnish a floating courtesy dock according to the Technical Specifications. 3.1.2. The Offeror must deliver and install a floating courtesy dock at the Santa Cruz Lake Recreation Area. Deliveries are permitted Monday to Friday, 8:00 AM -4:30 PM, excluding federal holidays. Installation is limited to Monday through Wednesday, 8:00 AM-4:30 PM, when the lake is closed to the public. 3.1.3. Offeror must provide O& M training for BLM Staff. Training to include, but not limited to: assembly, installation, connection to boat ramp, removal from lake, and maintenance. Offeror must supply product specific tools to assemble and install the courtesy dock and leave them with the BLM Staff for future use. This does not include common tools like drills, screw drivers, hammers, etc. Question Deadline 08/14/2026 Questions are due at least FIVE DAYS before the bid deadline. Submit questions to the Primary Point of Contact listed in the Contact Information Primary POC : Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov

GC Bidding

$250,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
24
Bidding Soon
475
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 4, 2026

Project location map

To Be Determined, Chimayo, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.