Updated November 14, 2023

Site work and renovation of a water / sewer project in Chimayo, New Mexico. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

State funding for this project will help secure an additional $11.6 million in federal funding for project completion. This will be a shovel-ready project as plans and design are scheduled for completion in 2022 and the required Environmental Assessment (will be paid for by NRCS) is ready for public review. Scope of work would be to renovate the existing flood-control dam by removing sediment, reconstructing the intake towers, increase dam height, re-constructing the principal spillway and enlarging the emergency spillway to meet current Dam Safety Regulations and Engineering Standards. Dam re-construction will need to take place in a single phase which is estimated to last 10 months and will be led by NRCS, a federal agency. NRCS is responsible 65% of the project and Santa Fe-Pojoaque SWCD, 35%. As of January 27, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. To plan design and construct the Santa Cruz Flood Control Dam Site 1 located in the Santa Fe Pojoaque Soil and Water Conservation District in Rio Arriba County. State funding for this project will help secure an additional $1.95 million in federal funding for project completion. This is a shovel-ready project as plans and design are complete and the required Environmental Assessment is ready . Scope of work would be to renovate the existing flood-control dam by removing sediment, reconstructing the intake towers, increase dam height, re-construct the principal spillway and enlarge the emergency spillway to meet current Dam Safety Regulations and Engineering Standards. Dam re-construction will need to take place in a single phase which is estimated to last 10 months.

Design

Water / Sewer

$6,850,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
13
Bidding Soon
246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.