Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Chimayo, New Mexico. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
State funding for this project will help secure an additional $11.6 million in federal funding for project completion. This will be a shovel-ready project as plans and design are scheduled for completion in 2022 and the required Environmental Assessment (will be paid for by NRCS) is ready for public review. Scope of work would be to renovate the existing flood-control dam by removing sediment, reconstructing the intake towers, increase dam height, re-constructing the principal spillway and enlarging the emergency spillway to meet current Dam Safety Regulations and Engineering Standards. Dam re-construction will need to take place in a single phase which is estimated to last 10 months and will be led by NRCS, a federal agency. NRCS is responsible 65% of the project and Santa Fe-Pojoaque SWCD, 35%. As of January 27, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. To plan design and construct the Santa Cruz Flood Control Dam Site 1 located in the Santa Fe Pojoaque Soil and Water Conservation District in Rio Arriba County. State funding for this project will help secure an additional $1.95 million in federal funding for project completion. This is a shovel-ready project as plans and design are complete and the required Environmental Assessment is ready . Scope of work would be to renovate the existing flood-control dam by removing sediment, reconstructing the intake towers, increase dam height, re-construct the principal spillway and enlarge the emergency spillway to meet current Dam Safety Regulations and Engineering Standards. Dam re-construction will need to take place in a single phase which is estimated to last 10 months.
Design
Water / Sewer
$6,850,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2024
To Be Determined, Chimayo, NM
Related To This Project
Chimayo, NM
Bid Date: Feb 28 2022
Chimayo, NM
Bid Date: Sep 25 2023
Chimayo, NM
Bid Date: Nov 05 2024
Chimayo, NM
Bid Date: Dec 03 2024
Bernalillo, NM
--
Timberon, NM
--
Valencia, NM
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.