Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 18, 2026 at 8:00 PM
Updated August 24, 2026
Site work and paving for a road / highway in Stockton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The City of Stockton is requesting proposals from qualified contractors to provide asphalt cold planing services to remove asphalt concrete using a milling machine in preparation for repair and repaving at job sites within the City. Question Deadline 08/19/2026 at 3:00 PM PT Any questions or requests for clarification shall be submitted in writing to: chanel.teach@stocktonca.gov The City contracts for asphalt concrete cold planing services to remove areas of failing or unsuitable asphalt concrete throughout the City. Asphalt concrete cold planing is the process of removing asphalt concrete with a milling machine in preparation for repair and repaving. The milling machine is equipped with a large drum and diamond tipped teeth, which removes a six-foot wide path of asphalt concrete to a pre-set depth and deposits the removed material onto a conveyor belt to transfer it to a truck for transport. Cold planing is a component of road repair and repaving work completed each year during the summer and early fall when the weather is typically favorable. The selected contractor would provide project management, coordination, service, and preparation of all required work, which will include, but is not limited to, the following tasks: Furnish all labor, materials, parts, equipment, and all vehicles necessary for asphalt concrete cold planing services to remove areas of failing or unsuitable asphalt concrete throughout the City. Services should be provided as requested by the City of Stockton Public Works Department. Provide all labor, equipment, materials, and disposal necessary to complete the work for the price quoted. Comply with State Water Board requirements and apply Best Management Practices. Contractors shall leave the work area free of all dirt, litter, debris, lubricants, or other materials following completion of work to the satisfaction of the Engineer. The City and the selected Contractor shall have the right to renew the agreement for up to one (1 ) additional two-year contract period. This Contract may be renewed only by mutual agreement between the parties involved. Each party retains the right not to renew the agreement at the time of scheduled expiration. The City does not guarantee any quantity of work and retains the right to use other contractors for the services. Asphalt concrete cold planing services shall typically occur during normal business hours. Notwithstanding any provision to the contrary herein, City shall have no obligation to give more than two notices of unsatisfactory performance in any calendar year. In the event two such notices of unsatisfactory performance are given in any calendar year, the City may thereupon terminate this contract immediately. Work will be performed in an orderly manner with minimum disturbance and inconvenience to the public. The Contractor shall confine and limit its personnel to only those areas required for performing the work.
GC Bidding
$1,100,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2026
November 2, 2026
To Be Determined, Stockton, CA
Related To This Project
Stockton, CA
Bid Date: Sep 08 2026
Stockton, CA
Bid Date: Sep 03 2026
Stockton, CA
Bid Date: Sep 04 2026
Stockton, CA
Bid Date: Sep 17 2026
Stockton, CA
Bid Date: Sep 08 2026
Stockton, CA
--
Stockton, CA
Bid Date: Sep 29 2026
Stockton, CA
Bid Date: Sep 03 2026
Stockton, CA
Bid Date: Sep 01 2026
RFP Contractor - Truck Hauling Services for Asphalt Concrete and Asphalt Concrete Grinding - 6242363
Stockton, CA
Bid Date: Aug 26 2026
Stockton, CA
Bid Date: Sep 02 2026
Stockton, CA
Bid Date: Sep 03 2026
Stockton, CA
Bid Date: Aug 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
