BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Renovation of a water / sewer project in Cañoncito, New Mexico. Completed plans call for the renovation of a water / sewer project.

The Project includes the following Work: Replace 23 rProject titled "Water Meter Replacement" entails: Replace 23 residential water service meters with radio read meters; Replace 23 meter box lids; Install new meter and can with service line. Optionally replace existing corp stops if missing or nonfunctioning. Work of the Contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions , Specification Sections, Drawings, Addenda and Modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and including, but not necessarily limited to , printed material referenced by any of these. It is recognized that work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomena, including weather conditions, and other forces outside the Contract Documents.esidential water service meters with radio read meters; replace 23 meter box lids; optionally replace existing corp stops if missing or nonfunctioning. Install one new meter and can with service line. Question Deadline 08/26/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents in writing Casey Cook, P.E., ccook@molzencorbin.com Questions received less than 7 days prior to the date for opening of Bids may not be answered. The Project has an expected duration of 60 days.

Sub-Bidding

$300,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
18
Bidding Soon
459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 2, 2026

Project location map

Multiple Locations, Cañoncito, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.