Published August 30, 2026 at 8:00 PM

Updated September 3, 2026

Site work and paving for a road / highway in Mountain City, Tennessee. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Street paving and milling of multiple roads, including asphalt application and road surface preparation. 2026 Paving List (All streets paved at 1.5" before compaction) 1. Graybeal Ave: Length - 365' Width - 19' 2. Skyline & Cress alley: Length - 201' Width - 15' 3. Reece Ave Alley: Length - 660' Width - 14' 4. Glenn Dr: Length - 148' Width - 12' (curve to Butler Ln) 5. Dotson Ln: Length - 2225' Width - 28' (see Milling List) 6. Popular St: Length - 516' Width -20', turn around 61' Width 7. Anderson Rd: Length - 278' Width - 10' 8. Rainbow Rd: Length - 996' Width - 22' 9. East Hillcrest Dr: Length - 194' Width - 18' (Bridge to Woodland Dr.) 10. Woodland Dr: Length - 1047' Width - 16' 11. Crossroads Dr: Length - 7647' Width - 22' (Burger King to Forge Creek Rd) 12. Crossroads Dr: Length - 2317' Width - 22' (Forge Creek Rd to Mike's BBQ) 2026 Milling List Note: All streets are to be milled for tie-ins located at the beginning and end of each map. 1. Dotson Ln: Mill length-2225' width-28' 1.5" 2026 Paving Operation and Roadway Work Zone Requirements _ All Bidding Contractors must be licensed, insured, and TDOT Certified! _ _ _ All Flagging Operation will be A lane closure for a two-lane two-way road with two (2) certified flaggers in full Ansi TDOT approved PPE (certification cards shall be shown to the onsite inspector if he/she so asks). Contractors must display three DOT Approved Advance warning signs spaced 200' between each sign; on each side of the work zone (One lane Road Ahead, Be Prepared to Stop, Flagger Ahead). Contractors must display two bump warning signs at each milled tie-in if left open overnight. Contractor must construct a temporary asphalt ramp for smooth transition at each butt joint if left unpaved overnight. All streets must have the edges clipped and debris removed, roadway swept prior to application of asphalt emulsion. Asphalt emulsion should be applied to each street prior to paving operation at a rate of .06 +/ .01 (onsite inspector will request daily application rate at the end of each workday or project completion). All streets shall be paved with RS9.5C mix

Post-Bid

$1,100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
85
Bidding Soon
1,079
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

September 1, 2026

Project location map

Multiple Locations, Mountain City, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.