BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 25, 2026

Site work and renovation of a detention facility in Longview, Texas. Completed plans call for the renovation of a detention facility.

Roof overlay project for the juvenile facility. Question Deadline 08/28/2026 at 5:00 PM CT All questions regarding this RFP must be in writing and sent by email to Purchasing Agent Kelli Davis at kdavis@greggcounty.texas.gov Online Portal Work shall include, but is not limited to: Remove loose gravel, dirt, vegetation, and debris from the existing roof and properly clean and prepare the existing roof surface to receive the new overlay system. Remove only those portions of the existing roofing system necessary for proper preparation, repairs, flashing, transitions, penetrations, or installation of the new roof overlay system. Furnish and install the specified cover board over the existing roof system. Cover board type, thickness, and attachment shall be compatible with the existing roof and approved as part of the roofing manufacturer's warranted assembly. Furnish and install a new 60-mil reinforced PVC roofing membrane over the prepared existing roof and cover board in accordance with manufacturer requirements. Provide and install Exterior Grade Plywood on the back side of parapet walls, where required, to provide a suitable substrate for roof-to-wall transitions. Extend and properly terminate the PVC membrane up the back side of parapet walls in accordance with manufacturer-approved details. Remove and replace existing parapet wall caps/coping as required for proper installation of the overlay system . Furnish and install new flashing at existing roof curbs, roof penetrations, roof-to-wall transitions, and other locations necessary to provide a complete watertight roofing system. Remove and replace existing pitch pans with manufacturer-approved penetration flashing assemblies or penetration pockets appropriate for the application. Furnish and install new drip edge and other required perimeter metal . Color shall be a standard manufacturer's color approved by the County prior to fabrication or installation. Furnish and install all sealants, fasteners, termination bars, adhesives, flashing, accessories, and miscellaneous components required for a complete roof overlay system.

Sub-Bidding

$330,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
74
Bidding Soon
702
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 2, 2026

Project location map

310 Turk St, Longview, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.