BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 24, 2026

Site work for a military facility in Cortland, Ohio. Working plans call for site work for a military facility.

Provide all labor, materials, equipment, supervision, and related construction services necessary to remove and replace the existing standing seam metal roof on the Control Tower Building. Work includes demolition and disposal of the existing roof system, box gutter, scuppers, and lightning protection system down to the concrete roof slab; inspection and refurbishment of existing metal sub-framing; replacement of deteriorated framing members as required; cleaning and protective coating of remaining structural components; repair, cleaning, sealing, and flood testing of the concrete roof slab; installation of closed-cell spray polyurethane foam insulation with a minimum R-30 thermal resistance value; and installation of a new 22-gauge structural standing seam metal roof system with a high-performance PVDF finish. Additional work includes rerouting existing vent and exhaust piping through the masonry side wall, installing a new gutter system, eliminating the existing box gutter configuration, incorporating new ridge and fascia ventilation, installing a custom-fabricated ventilated peak cap, and furnishing and installing a new certified non-penetrating lightning protection system. The contractor shall provide all required submittals, including quality control, safety, and project-specific plans, and perform all work in accordance with applicable USACE requirements and standards. The estimated construction magnitude is between $150,000 and $350,000, with a performance period of 365 calendar days from Notice to Proceed. Location: Mosquito Creek Lake Control Tower Building, Cortland, OH 44410. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

$350,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
176
Bidding Soon
2,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

Project location map

To Be Determined, Cortland, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.