Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2026 at 8:00 PM

Updated September 22, 2026

Site work and renovation of an educational facility in Casco, Michigan. Completed plans call for the renovation of a educational facility.

The intent of this Scope of Work and any attached supporting documentation including any applicable addenda (e.g. stamped drawings/documentation) is to provide the Subcontractor with general conformance guidelines. Subcontractor shall be responsible for performing any/all applicable site investigation to ensure that the desired results are achieved . In this case, the desired results are Replacing existing chiller(s) and chilled water pump(s) by providing and installing new higher efficiency part-load chiller(s) and chilled water pump(s) necessary to improve cooling system efficiency within the buildings identified in the accompanying MEP drawing sets. Replacing existing roof-top units (RTU's) and air-handling units (AHU's) by providing and installing new higher efficiency equipment necessary to improve heating & cooling system efficiency within the buildings identified in the accompanying MEP drawing sets. In the replacement of equipment, Subcontractor shall ensure that new equipment installed meets the existing performance characteristics illustrated in Exhibit B unless otherwise specified Input capacities Flow rate (GPM) Pump head (Ft) Electrical characteristics Question Deadline 08/31/2026 at 5:00 PM ET Deadline for Questions Contact with bidding questions todd.kananen@centrix-partners.com cc emails to greg.mizell@centrix-partners.com Facility Improvement Measures (FIM ) to be implemented in Anchor Bay Schools to upgrade infrastructure and improve energy efficiency. Bonds: 2.5% Bid Bond.

Post-Bid

$500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
156
Bidding Soon
2,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

February 1, 2027

Project location map

Multiple Locations, Casco, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed