Demolition, site work and renovation of a civil project in Richmond, Virginia. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

Removal and replacement of multiple AC units, air-cooled chiller, and complete DDC system replacement. Plumbing work includes installing floor drains, neutralization basin, and tepid water circulation lines. Supporting structural and architectural work includes enlarging door openings in CMU, pipe penetrations, concrete equipment pads, and supplemental steel framing/flashing. The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilities ' Water Treatment Facility (WTF) located at 10111 Three Chopt Road, Richmond, VA; and Raw Water Pump Station (RWPS) located at 1201 South Gaskins Road, Richmond, VA, including removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU- 10 and associated ACC-5, ACU- 11 and associated ACC-6, ACU-7 and associated ACC-4, ACU- 6 and associated ACC- 1 and all associated refrigeration piping, piping accessories and supports serving the main water plant. Work at the main water plant also includes the removal and disposal of the air-cooled chiller (CHIL- 1 ) located outside on grade. Work also consists of the removal and disposal of ACU- 1 and associated ACC- 1 and all associated refrigerant piping, piping accessories, and supports at the Raw Water Pumping Station as well as the removal and disposal of the through-the-wall air conditioner (WAC- 1) serving the control room in the pumping station. All refrigerant must be recovered from existing systems and disposed of in compliance with local, state and federal regulations prior to systems demolition. All systems listed above will be replaced and the DDC system serving the Water Treatment Facility, Washwater/Sludge Pump Station, and the Raw Water Pump Station will be replaced in its entirety along with associated control components. Plumbing work includes the provision of floor drains in the lab space to serve the existing emergency plumbing fixtures. These drains will be tied into a new neutralization basin located in the interstitial space, and tied in parallel to the existing neutralization basin. A new tepid water circulation line will be installed between the water heaters and the emergency plumbing fixtures in order to provide immediate access to tepid water at the emergency fixtures. Supporting structural and architectural work includes, but not limited to, enlarging interior door opening in CMU wall, pipe penetrations through CMU and concrete, concrete equipment pads, and supplemental steel framing and flashing at new openings in the metal roof deck. The Work shall be completed over three (3) phases. Work under each of the three phases may be completed concurrently, but priority shall be given to Phase 1 , followed by Phase 2 , then Phase 3. Accordingly, substantial completion times have been applied to each of the work completion phases . TAB work for each item of equipment shall be included in the phase where that equipment is installed. Direct any questions, concerning the Project Manual and Drawings in writing through the Questions function in Procure Ware. Clarification Deadline: 9/22/2026 11:59 PM

GC Bidding

$500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
105
Bidding Soon
2,111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2026

October 30, 2026

Project location map

10111 Three Chopt Rd, Richmond, VA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed