BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated September 1, 2026

Site work, paving and renovation of a municipal facility in Milwaukie, Oregon. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; and for paving for a municipal facility.

Sanitary pipe bursting, stormwater pipe installation, concrete flatwork, ADA ramps, and water system installation. City's engineer estimate for this project ranges from $1,060,000 to $1,237,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project consists of approximately 219 feet of 10-inch sanitary pipe bursting, 76 feet of 10-inch stormwater pipe, 4 G-2 catch basins, 8,300 square yards of cold plane pavement removal , 965 tons of Level 3, inch ACP, 192 feet of standards curbs, 219 feet of curb and gutters, 496 square feet of concrete driveways, 1,658 square feet of concrete sidewalk, 8 ADA ramps, 336,154 feet of paint longitudinal pavement markings, 3 hydrants assemblies, 302 feet of 4-inch ductile iron water pipe, 42 feet of 6-inch ductile iron water pipe, 49 feet of 8-inch ductile iron water pipe, 14-inch water blowout assembly, and 118 feet of 1 -inch water service connection pipes. City of Milwaukie (City) is seeking bids from qualified and experienced contractors for sanitary pipe bursting, stormwater pipe installation, concrete flatwork and ADA ramps, and water system installation. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in specifications including but not limited to: oSanitary pipe bursting oInstall storm water pipes o Install concrete storm inlets oInstall asphalt concrete pavement o Install concrete ADA sidewalks and curb ramps o Install concrete curb and gutter oInstall longitudinal pavement markings o Install thermoplastic markings oInstall ductile water pipeline and water service connections oAll work must be completed by June 30, 2027 Question Deadline 09/09/2026 at 2:00 PM All questions and clarifications for this ITB must be addressed through the Procurement Portal by clicking on Messages and then the Public Q&A tab within the desired solicitation.

GC Bidding

$1,237,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
74
Bidding Soon
1,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.