BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Renovation of a municipal facility in El Paso, Illinois. Completed plans call for the renovation of a municipal facility.

Question Deadline 09/01/2026 at 10:00 AM CT Questions regarding this RFP shall be submitted in writing prior to the stated deadline. Responses and any modifications to this solicitation will be issued through written addenda. The selected contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the project, including but not limited to: Selective Demolition Remove existing damaged siding, trim, and exterior finishes as required. Demolish materials down to the existing sheathing where necessary. Dispose of all demolition debris in accordance with applicable regulations. Structural Remediation Inspect all exposed framing and structural components. Repair or replace deteriorated wood framing, rusted structural steel, damaged sheathing, and compromised masonry as required. Moisture Management Install a continuous weather-resistant barrier (WRB) and vapor barrier where specified. Ensure all flashing and waterproofing systems are properly integrated. Exterior Facade Installation Install new exterior finishes. Acceptable materials may include: Fiber cement siding Composite exterior panels Masonry restoration and repair Other approved facade systems Final material selections will be coordinated with the city. Trim, Sealants, and Finishing Install all required trim components. Caulk and seal all joints, penetrations, windows, doors, and transition points to provide a weather-tight envelope. Site Protection and Cleanup Maintain a clean and safe job site throughout construction. o Remove debris daily. o Restore all disturbed areas upon project completion. The City of El Paso reserves the right to reject any or all proposals, to waive informalities or irregularities in the bidding process, and to accept the proposal deemed to be in the best interest of the City. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

$150,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
135
Bidding Soon
1,838
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 2, 2026

Project location map

125 W Front St, El Paso, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.