Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 14, 2026 at 8:00 PM
Updated September 20, 2026
Demolition, site work and paving for a municipal facility in Dixon, Illinois. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for paving for a municipal facility.
The project consists of resurfacing the parking and operational lot at the Lee County Maintenance Facility located at 306 S. Hennepin Avenue, Dixon, Illinois. The work generally includes removal and legal disposal of existing asphalt pavement; excavation and preparation of the existing subgrade as required; grading and compaction; installation of 2 inches of hot-mix asphalt binder course and 2 inches of hot- mix asphalt surface course, for a total compacted asphalt thickness of 4 inches; traffic control; cleanup; site restoration; and related work necessary to provide a complete project. The contractor shall furnish all labor, supervision , materials, equipment, tools, hauling, disposal, traffic control, and incidentals necessary to complete the work in accordance with the Contract Documents. Questions or requests for clarification shall be submitted in writing no later than September 8, 2026, to: Greg Saunders FMD Foreman gsaunders@countyoflee.org Anticipated Start: September 21, 2026 Substantial Completion : September 25, 2026 Final Completion: September 25, 2026 The contractor shall: Remove existing asphalt pavement within the project limits. Sawcut pavement where necessary to provide neat, straight transitions to surfaces remaining in place. Load, haul, and legally dispose of removed asphalt and associated debris. Protect pavement and improvements designated to remain . Repair damage caused by the contractor's operations at no additional cost to Lee County. 1 Remove 2" asphalt paving core 14" for new base 2 Concrete sidewalk to remain 3 Concrete paving to remain 4 Landscaping rock to remain 5 4" concrete-filled metal bollard to remain 6 Repair all city sidewalks, curb & gutter and asphalt streets where damaged during this work 7 Remove sidewalk
Bid Results
$62,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2026
September 21, 2026
306 S Hennepin Ave, Dixon, IL
Related To This Project
Dixon, IL
Bid Date: Oct 08 2026
Dixon, IL
--
Dixon, IL
Bid Date: Sep 04 2026
Dixon, IL
Bid Date: Sep 18 2026
Dixon, IL
Bid Date: Sep 18 2026
Dixon, IL
Bid Date: Sep 18 2026
Dixon, IL
Bid Date: Sep 01 2026
Dixon, IL
Bid Date: Nov 06 2026
Dixon, IL
--
Dixon, IL
--
Dixon, IL
--
Dixon, IL
--
Dixon, IL
--
Dixon, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
