BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 13, 2026

Site work and renovation of a water / sewer project in Holly Ridge, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Removal and replacement of existing brine tank #1, connection to existing piping, and installation of a new automatic self-contained salt storage and dissolving unit. Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). The project will consist of removing and replacing the existing brine tank #1 and connecting to existing piping. The existing tank site glass and level control assembly will be reused on the new brine tank. The new brine tank shall be completely automatic and self-contained salt storage and salt dissolving unit for producing fully saturated brine from rock, solar or evaporated salt products capable of producing 20 to 35 gallons per minute of saturated brine flow under normal operating conditions. To minimize disruptions to ongoing plant operations, the awarded Bidder shall procure and secure delivery of the tank prior to initiating any construction activities on the project site. Due to the anticipated long lead time associated with tank fabrication , the awarded Bidder shall proactively coordinate with ONWASA and the Engineer to provide routine updates on procurement activities, manufacturing progress, anticipated delivery dates, and schedule impacts to ensure alignment with the overall project timeline. Upon delivery of the tank to the project site, ONWASA will accept and approve payment for the tank, and the Contractor shall commence construction activities on the first calendar day following delivery and shall diligently prosecute the Work to completion. All Work shall be completed within ninety (90) consecutive calendar days following delivery of the tank to the project site. Bids must be submitted on a complete contract. Bids must be enclosed in a sealed envelope, addressed to the Onslow Water and Sewer Authority, 228 Georgetown Road, Jacksonville, NC 28540, telephone (910) 455-0722, and the outside of the envelope must be marked "Dixon WTP Brine Tank Replacement", Attention: Kirsten Larsen, Engineering Coordinator. If a Bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed as above Question Deadline 09/25/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Questions received less than ten (10) calendar days prior to the date for the opening of bids will not be answered

Sub-Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
50
Bidding Soon
613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2026

November 6, 2026

Project location map

6661 Wilmington Hwy, Holly Ridge, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.