Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 19, 2026 at 8:00 PM
Updated October 21, 2026
Site work, renovation and addition to a mixed-use development in Millis, Massachusetts. Completed plans call for the renovation of a 55,000-square-foot educational facility; and for the addition of a educational facility.
Estimated Cost $98 million Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. VBE/SDVOBE: 3.0% Question Deadline 10/26/2026 at 5:00 PM ET All questions regarding this RFQ should be submitted to The Vertex Companies, Questions should be submitted by email to Laureen Westman at opmprocurement@vertexeng.com. Trade Contractor Statement of Qualifications Forms from interested subcontractors: Masonry (ECC $3,950,000), Misc. & Orn. Iron (ECC $1,400,000), Waterproofing, Dampproofing & Caulking (ECC $470,000), Roofing & Flashing (ECC $4,045,000), Metal Windows (ECC $2,200,000), Glass & Glazing (ECC $320,000), Tile (ECC $540,000), Acoustical Tile (ECC $880,000), Resilient Floors (ECC $950,000), Painting (ECC $520,000), Fire Protection (ECC $1,220,000), Plumbing (ECC $3,520,000), HVAC (ECC $13,230,000), & Electrical (ECC $11,050,000). Only prequalified Trade Contractor firms will be permitted to submit bids for the category of work in which they were prequalified. Sub Bid Category Masonry; Misc. Metals; WDC; Roofing; Metal Windows; G&G; Tile; Acoustical Ceilings; Resilient; Painting; Fire Protection; Plumbing; HVAC; Electrical Addition and renovation of the existing Middle/High School in Millis, Massachusetts. Upon completion, the facility will serve approximately 645 students in grades 6-12 and will continue to accommodate the Superintendent's Office and School Business Office. Site improvements are limited to new site circulation, parking, drainage, utilities, an outdoor classroom, and landscaping. Construction will be carried out in multiple phases on a constrained, occupied campus. The school will remain operational throughout construction , requiring careful planning, sequencing, and coordination to maintain safe access for students, staff, and visitors while minimizing disruptions to ongoing educational and administrative activities. The phased approach will allow the project to progress efficiently while ensuring the continued operation of the school and associated offices. The Millis Middle/High School building was originally built in 1960 as a Junior/Senior High School for grades 7 through 12. In 1966, there was a 24-classroom addition and an increase in the size of the cafeteria and locker rooms to accommodate an increase in the student population. The building is a two-story brick and mortar structure of 125,000 square feet. In 1999, the building was renovated, but no additions were constructed. The current school serves 645 students in grades 6-12. This project includes demolition of the southwestern wing of the existing school , renovation of the remaining existing school facility, including removal of existing interior partitions, and construction of an approximately 55,000-square-foot new building addition along the south and east sides of the existing structure and new maintenance shed . The addition will include new classrooms, a gymnasium, restrooms, and office space. A new elevator will be constructed within the addition, adjacent to the southern wall of the existing building. The existing gym will be repurposed into an alternate PE space and media center, and existing high school classrooms , locker rooms, will be renovated and reconfigured. The site work is limited to new site circulation, parking , drainage, utilities, outdoor classroom and landscaping. Construction will be carried out in multiple phases over a 28- month period on a constrained, occupied campus. The school will remain operational throughout construction, requiring careful planning, sequencing, and coordination to maintain safe access for students, staff, and visitors while minimizing disruptions to ongoing educational and administrative activities. The phased approach will allow the project to progress efficiently while ensuring the continued operation of the school and associated offices. This project will have Business Enterprise Participation goals per the MSBA protocol, provided by the Massachusetts Supplier Diversity Office, along with Workforce compliance goals. The Owner's Project Manager is The Vertex Companies, the Project Designer is Tappe Architects, the Construction Manager is Fontaine Brothers, Inc.
Sub-Bidding
$98,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2026
February 1, 2027
245 Plain St, Millis, MA
Related To This Project
Millis, MA
--
Millis, MA
Bid Date: Nov 04 2026
Millis, MA
Bid Date: Sep 22 2026
Millis, MA
Bid Date: Sep 17 2026
Millis, MA
Bid Date: Nov 06 2026
Millis, MA
Bid Date: Aug 17 2026
Millis, MA
Bid Date: Apr 29 2026
Millis, MA
Bid Date: Dec 22 2025
Changeout of Granular Activated Carbon (GAC) Media and Removal/regeneration of Spent Media - 5768339
Millis, MA
Bid Date: May 21 2025
Millis, MA
Bid Date: Apr 16 2025
Millis, MA
--
Millis, MA
Bid Date: Jan 23 2025
Millis, MA
Bid Date: Jan 13 2021
Millis, MA
Bid Date: Jan 13 2021
Millis, MA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed