Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 21, 2026

Site work, renovation and addition to a mixed-use development in Millis, Massachusetts. Completed plans call for the renovation of a 55,000-square-foot educational facility; and for the addition of a educational facility.

Estimated Cost $98 million Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. VBE/SDVOBE: 3.0% Question Deadline 10/26/2026 at 5:00 PM ET All questions regarding this RFQ should be submitted to The Vertex Companies, Questions should be submitted by email to Laureen Westman at opmprocurement@vertexeng.com. Trade Contractor Statement of Qualifications Forms from interested subcontractors: Masonry (ECC $3,950,000), Misc. & Orn. Iron (ECC $1,400,000), Waterproofing, Dampproofing & Caulking (ECC $470,000), Roofing & Flashing (ECC $4,045,000), Metal Windows (ECC $2,200,000), Glass & Glazing (ECC $320,000), Tile (ECC $540,000), Acoustical Tile (ECC $880,000), Resilient Floors (ECC $950,000), Painting (ECC $520,000), Fire Protection (ECC $1,220,000), Plumbing (ECC $3,520,000), HVAC (ECC $13,230,000), & Electrical (ECC $11,050,000). Only prequalified Trade Contractor firms will be permitted to submit bids for the category of work in which they were prequalified. Sub Bid Category Masonry; Misc. Metals; WDC; Roofing; Metal Windows; G&G; Tile; Acoustical Ceilings; Resilient; Painting; Fire Protection; Plumbing; HVAC; Electrical Addition and renovation of the existing Middle/High School in Millis, Massachusetts. Upon completion, the facility will serve approximately 645 students in grades 6-12 and will continue to accommodate the Superintendent's Office and School Business Office. Site improvements are limited to new site circulation, parking, drainage, utilities, an outdoor classroom, and landscaping. Construction will be carried out in multiple phases on a constrained, occupied campus. The school will remain operational throughout construction , requiring careful planning, sequencing, and coordination to maintain safe access for students, staff, and visitors while minimizing disruptions to ongoing educational and administrative activities. The phased approach will allow the project to progress efficiently while ensuring the continued operation of the school and associated offices. The Millis Middle/High School building was originally built in 1960 as a Junior/Senior High School for grades 7 through 12. In 1966, there was a 24-classroom addition and an increase in the size of the cafeteria and locker rooms to accommodate an increase in the student population. The building is a two-story brick and mortar structure of 125,000 square feet. In 1999, the building was renovated, but no additions were constructed. The current school serves 645 students in grades 6-12. This project includes demolition of the southwestern wing of the existing school , renovation of the remaining existing school facility, including removal of existing interior partitions, and construction of an approximately 55,000-square-foot new building addition along the south and east sides of the existing structure and new maintenance shed . The addition will include new classrooms, a gymnasium, restrooms, and office space. A new elevator will be constructed within the addition, adjacent to the southern wall of the existing building. The existing gym will be repurposed into an alternate PE space and media center, and existing high school classrooms , locker rooms, will be renovated and reconfigured. The site work is limited to new site circulation, parking , drainage, utilities, outdoor classroom and landscaping. Construction will be carried out in multiple phases over a 28- month period on a constrained, occupied campus. The school will remain operational throughout construction, requiring careful planning, sequencing, and coordination to maintain safe access for students, staff, and visitors while minimizing disruptions to ongoing educational and administrative activities. The phased approach will allow the project to progress efficiently while ensuring the continued operation of the school and associated offices. This project will have Business Enterprise Participation goals per the MSBA protocol, provided by the Massachusetts Supplier Diversity Office, along with Workforce compliance goals. The Owner's Project Manager is The Vertex Companies, the Project Designer is Tappe Architects, the Construction Manager is Fontaine Brothers, Inc.

Sub-Bidding

$98,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
861
Active Projects
443
Bidding Soon
5,715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2026

February 1, 2027

Project location map

245 Plain St, Millis, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed