Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2026 at 8:00 PM

Updated October 15, 2026

Site work and paving for a civil project in Crafton, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Installation of new storm sewer pipe, inlets and manholes; clearing and grubbing; traffic control; erosion and sedimentation control; existing utility protection; street reconstruction; replacement of existing concrete curb, gutter, sidewalk, and handicap ramps; bituminous milling and overlay; and site restoration. Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Maintenance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 10/08/2026 at 4:00 PM ET Online Portal

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
182
Bidding Soon
2,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

November 9, 2026

Project location map

Perrine St, Crafton, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed