Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2026 at 8:00 PM

Updated November 4, 2026

Site work and renovation of a playground / park / athletic field in Saint Charles, Missouri. Completed plans call for the renovation of a playground / park / athletic field.

St. Charles County is seeking bids for the Veteran's Tribute Park Playground Renovation. The Veteran's Tribute Park Playground Improvements Project includes the construction of improvements that will address on-site erosion issues in and around the central playground. Veterans Tribute Park is located at 1031 Kisker Road in Weldon Springs, Missouri. Playground improvements will include, but not be limited to the following: 1. Site preparation. 2. Removal of existing synthetic turf, shock pad , leveling and recompaction of base course 3. New inlets & subsurface drainage 4. New concrete curb 5. Earthwork 6. Plantings 7. Segmental Retaining Walls 8. Natural Stone Retaining Walls 9. New Safety Surfacing (to be provided and installed separately by another contractor) 10. New Concrete Steps Question Deadline 09/28/2026 at 3:00 PM CT Any questions or clarifications concerning this Request for Bid must be submitted in writing via E-mail (preferred), or mail to: Lenore Moore, Purchasing Coordinator St. Charles County Government Finance Department 201 North Second St St. Charles, Missouri 63301 Imoore@sccmo.org For questions or inquiries concerning the specifications please contact: Jake McDermott, PE, Project Manager Parks Department St Charles County Government 201 North Second St, Room 510 St. Charles, Missouri 63301 jmcdermott@sccmo.org BID ALTERNATE 1 : NORTH PLAY AREA SURFACE DEMOLITION - As shown on Sheet DP-102, Demolition Plan, General Contractor will remove existing safety surfacing and shock pad in the North Play Area. Level and recompact aggregate base. Provide a performance bond in the amount indicated below. Safety surfacing will be provided and installed by a separate contractor. - 2. BID ALTERNATE 2: CATCH BASIN DAYLIGHT - Bore 6", SDR35 pipe under existing sidewalk and daylight at bottom of existing slope. Provide 20 linear feet of additional pipe over base bid length indicated on the drawings. Daylight option in lieu of connecting to existing playground underdrain as shown on SP-101 , if existing pipe can't be reasonably located. Provide price per location (4 possible locations). Completion- 60 calendar days of the Notice to Proceed.

Bid Results

$214,533.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
65
Bidding Soon
1,667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2026

November 4, 2026

Project location map

1031 Kisker Rd, Saint Charles, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed