BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 12, 2026

Site work, paving and renovation of a mixed-use development in West Chicago, Illinois. Completed plans call for the renovation of a playground / park / athletic field; for site work for a municipal facility; and for paving for a municipal facility.

Rehabilitation of two parking lots to include HMA surface removal , preparation of existing aggregate base, aggregate base repair (as needed), prime coat, and 2-in HMA surface course paving. Alternative bids will also be accepted to include 1 ) additional subgrade improvements via geogrid application and/or 2) rehabilitation of an adjacent HMA pedestrian path This parking lot rehabilitation project is located at two separate locations within the Township of Big Rock. Location 1 is at the Community Park parking lot near the intersection of 6th Street and Madison Avenue. Location 2 is the Big Rock Township Hall parking lot at the northeast corner of the Rhodes Avenue and 5th Street intersection. Improvements at both Locations will include asphalt surface removal , spot aggregate base repairs as needed, repaving with 2-in asphalt surface removal , re-striping, and restoration . The work will also include restoration and landscaping of all disturbed areas, traffic control and protection, as well as all incidental and collateral work necessary to complete the improvements described herein. BID ALTERNATIVES: The project consists of improvements at two separate locations identified as Location 1 and Location 2. A Base Bid and Bid Alternatives are provided as indicated in the Proposal . The Total Base Bid shall consist of the sum of Base 1 and Base 2. Bidder selection and determination of the lowest responsible bidder shall be based solely upon the Total Base Bid. Bid Alternatives will not be considered in determining the lowest responsible bidder. For Location 1 , the Township may elect to award either Base 1 or Alternative 1A. Alternative 1A shall be considered in lieu of Base 1 and generally includes additional preparation of the existing aggregate base and installation of geogrid prior to HMA resurfacing. Alternative 1B consists of resurfacing the pedestrian path and may be awarded in addition to the selected Location 1 parking lot improvements. For Location 2, the Township may elect to award either Base 2 or Alternative 2A. Alternative 2A shall be considered in lieu of Base 2 and generally includes additional preparation of the existing aggregate base and installation of geogrid prior to HMA resurfacing. Following determination of the lowest responsible bidder based on the Total Base Bid, the Township reserves the right to accept or reject any or all Bid Alternatives in accordance with the Contract Documents, based upon available funding and the best interests of the Township. Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount). Location Big Rock Community Park Parking Lot and Township Hall Lot If you have questions pertaining to this bid you may contact: Jennifer Smith Township Clerk 630-556-4340 clerck@bigrocktownship.com

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
258
Bidding Soon
3,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

November 20, 2026

Project location map

Multiple Locations, West Chicago, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.