Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 24, 2026 at 8:00 PM
Updated September 29, 2026
Site work and renovation of a municipal facility in Rock Island, Illinois. Completed plans call for the renovation of a municipal facility.
Rehabilitation of a residential property including carpentry, electrical, plumbing, and HVAC work. All questions shall be directed to the Construction Officer at 309-732-2906. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable IDHA, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet all project objectives. The contractor shall have 30 days to complete the work from the date of contract signing. Change work orders over the course of the project are strongly discouraged. Carpentry: Remove existing roof on the house down to sheathing. Replace any rotted or damaged wood. If this is old slat sheathing with gaps larger than 1/2" then osb or plywood may need to be installed as a substrate in accordance with shingle manufacturer's instructions. Ice and snow guard must be installed per code and water barrier over remaining roof, if using traditional felt paper 30 lbs. minimum requirement. Use 2" style D roof edge. Install new flashing over plumbing boots, mast, and flues. Shingle's will be a minimum of 35 year manufactures warranty. Color selection will be decided by the homeowner from a color selection the contractor shall provide at the preconstruction meeting. Install new roof flashing for plumbing vents and electrical masts. Patch the holes from the box vents using approved material, furring then new flush to the existing sub straight. Remove center sheathing along the peak to manufacture's specifications for a shingle over ridge vent. Install a new ridge vent over the entire length of the peak on the house, not to encroach into the overhangs. There has been leaking around the dormers on the front elevation. This may require the remove of siding to ensure the walks and windows on the dormers are flashed correctly with new material creating a tight seal at the roof lines. Clean out all the gutters when the roof has been completed. Remove the siding beneath the slider at the rear of the home. Install house wrap and two by ledger boarded secured to the home with appropriate fasteners. Dig two post hole footings 42" deep with 12" round tubes. Footings must be inspected before filling with concrete. Building a landing 3.5" finished height below the slider. The landing width should be the same width as the door. Bring the landing out 4' from the building. Use Z flashing under the door and on top of the deck framing behind the existing siding. Install a set of stairs complete with treads, cut stringers, risers and handrail down both sides. Install a handrail around the landing. Install concrete pavers leveled up for the stringers to rest on keeping them from making direct contact to the ground. All decking material shall be treated. Inspection shall be called in once the landing has been framing before covering the landing with deck boards. Fail to do so may result in removal of decking for the building inspector to get verification of fasteners. Install furring strips around the slider and a drip cap flashing on top on the slider over the furring strips behind the siding. Install White J-channel for the siding at the slider. Install white break metal over the furring strips tucked into slider and J -channels. Caulk with white quad when finished. Electrical : Reroute the electrical power for the garage out from under the slider. Remove the electrical panel in the basement and install a new 100-amp 30 space panel . Install the meter socket on the exterior of the home with a disconnect. The panel must be labeled in ink for all the circuit's that are landed. Install a GFCI courtesy at the panel on its own circuit. Install a light and switch at the real slider with a motion sensor. Install GFCI at the rear slider with weather proof cover. Trouble shoot and clean up the basement wiring. Install receptacle covers throughout the house. Including hanging fixture in the attic. Install ceiling fan light combo in the living. This will need a cut in rated ceiling fan box and power. Install this in the center of the room. Replace the basement landing figure with new ceiling mount LED. Replace hallway first floor ceiling fixture with new LED ceiling mount. Replace the fan light combos in both bedrooms with Hunter or Harbor breeze units. Replace front entry light fixture in the soffit with a LED like kind. HVAC: Replace the AC unit on the exterior with new compressor. Install a new disconnect on the exterior. New line sets and new electrical whip installed to the new compressor unit. Remove the flue from the roof down to the basement. Install a new B vent hooked to the gas fired appliances in the basement up through the roof. Install weather cap on the flue, a storm collar and new roof flashing. There is access in the attic to remove and install new flue. The first floor will take some planning on removing this section due to no access. Install new A-coil and patch the vent coming directly out of the plenum. Install paste or duct seal on all the exposed ducts that are exposed. Replace any rusted or incorrect ducts. HVAC, Electrical, Building Permits are required before work beings.
Post-Bid
$470,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2026
October 22, 2026
816 21st St, Rock Island, IL
Related To This Project
Rock Island, IL
Bid Date: Sep 14 2026
Rock Island, IL
Bid Date: Oct 15 2026
Rock Island, IL
Bid Date: Oct 14 2026
Rock Island, IL
Bid Date: Oct 13 2026
Rock Island, IL
Bid Date: Oct 09 2026
Rock Island, IL
Bid Date: Oct 06 2026
Rock Island, IL
Bid Date: Oct 01 2026
Rock Island, IL
Bid Date: Oct 23 2026
Rock Island, IL
Bid Date: Sep 14 2026
Rock Island, IL
Bid Date: Sep 08 2026
Rock Island, IL
Bid Date: Sep 02 2026
Rock Island, IL
Bid Date: Sep 15 2026
Rock Island, IL
Bid Date: Sep 17 2026
Rock Island, IL
Bid Date: Sep 01 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed