BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2026 at 8:00 PM

Updated September 25, 2026

Site work and renovation of a water / sewer project in San Pablo, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work covered by this contract will be performed at West County Wastewater Tara Hills Lift Station at 2250 Tara Hills Drive, San Pablo, CA 94806, and will also occur at multiple other locations along the Tara Hills Force Main alignment, as specified in the bid document.. B. The work includes, but is not necessarily limited to, the following: i . Installation of Launch Barrel ii. Installation of Receive Barrel iii. Removal of Plug Valve & Replacement of Full Port Gate Valve iv. Potholing v. Project Support Question Submission Deadline:September 21, 2026, 5:00pm Inquiries regarding further information about the project shall be submitted in writing through the OpenGov Question/Answer Tab via WCW's e-Procurement portal. CW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an in-line assessment of the Tara Hills Force Main . The assessment will require launching and receiving a series ( approximately 3) progressive pigs and one ( 1) diagnostic and mapping pig ( probe). To perform this in-line phase of the assessment, Civil work is required to install a Launch Barrel , install a Receive Barrel, and remove a plug valve and replace it with a full-port gate valve. By-passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by electromagnetic thickness testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing must be provided by the Civil Contractor to enable access to the pipeline crown. The civil work scope also includes assisting the assessment pigging/probe consultant in launching and retrieving the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The locations of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist the Assessment Consultant by providing support with tasks to insert and retrieve the pigs and the probe, and to supply supplemental water.

GC Bidding

$1,361,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
507
Active Projects
181
Bidding Soon
3,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2026

November 16, 2026

Project location map

Multiple Locations, San Pablo, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.