Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 16, 2026 at 8:00 PM
Updated September 21, 2026
Site work and paving for a mixed-use development in Tukwila, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The City of Tukwila is requesting statements of interest from consulting firms with expertise in civil engineering design for the Airport Way Overlay Project. The anticipated duration of this work is approximately one year, with the option for the City to extend the contract for additional time and funding if needed . The project work includes final design ( 30%, 60%, 90% , and 100% submittals) and bid - ready documents; and necessary permitting. The City also reserves the option to, at their sole discretion, award subsequent phases of work that may include support during bidding and construction support. The work shall be in accordance with the Local Agency Guidelines (LAG) manual . The goal of this project is to replace the existing top layer of asphalt along Airport Way South, from South Boeing Access Road to the northern city limits. The attached Exhibit 1 (Vicinity Map) shows the project limits. The project aims to improve ride quality by smoothing surface imperfections, enhance safety through better traction and pavement performance, and protect the underlying pavement from further deterioration caused by traffic and weather. Additional work items include new channelization, utility adjustments, repair of curb and gutter, sidewalk, guardrail, and ADA upgrades, as necessary. This material can be made available in an alternate format by emailing Joe Dapcevich at Joe.Dapcevich@Tuk wilaWA.gov or by calling collect 206-902-6690. Any questions regarding this project should be directed to Joe Dapcevich . Only email inquiries will be accepted. A zero FSBE goal has been assigned and a voluntary SBE goal amount of ten percent of the Consultant Agreement is established. The Consultant shall develop an SBE Participation Plan prior to commencing work. Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not. Any questions regarding this project should be directed to Joe Dapcevich. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
$300,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2027
Airport Wy S, Tukwila, WA
Related To This Project
Tukwila, WA
Bid Date: Sep 16 2026
Tukwila, WA
Bid Date: Sep 29 2026
Tukwila, WA
--
Tukwila, WA
Bid Date: Jul 06 2026
Tukwila, WA
Bid Date: Jun 15 2026
Tukwila, WA
--
Tukwila, WA
--
Tukwila, WA
Bid Date: Apr 27 2026
Tukwila, WA
Bid Date: Jun 02 2026
Tukwila, WA
Bid Date: Jun 11 2026
Tukwila, WA
Bid Date: Jun 11 2026
Tukwila, WA
--
Tukwila, WA
Bid Date: Mar 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
