BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 24, 2026

Site work for a water / sewer project in Les Cedres, Quebec. Completed plans call for site work for a water / sewer project.

Reference number: 20170859 Deadline for receipt of complaints 2026-09-25 There is provision for a tendering process for each tender No Expected duration of the contract without options (in months) 2 Description Without being limited to it, the work consists of: - The organization of the worksite; - Site safety; - The installation of signs for barriers and detours; - Environmental protection; - Surface and groundwater management, including pumping; - The maintenance of the temporary network in place for domestic waters; - Site protection, including deforestation; - The disposal of excavation surplus; - The installation of discharge pipes; - Cleaning and testing of pipes and structures; - The commissioning of equipment; - The development and repair of turf, sown and pebble bed surfaces; - The renovation of the premises. The work also includes all related work required to complete the work according to the plans and specifications. The Contractor is also responsible for: - The study and implementation of execution methods, including shoring when required; - The planning, organization, direction and control of the execution of the work in order to ensure that it is consistent with its intended use and executed according to the rules of the art; - The study and establishment of site facilities and temporary works; - The supply of equipment and materials of all kinds, necessary for the complete and compliant execution of the works and supplies covered by the contract; - Health and safety prevention on the construction site and compliance with current laws and regulations; - The location of the work; - The quality of the work carried out, the performance testing and quality control to ensure that the work carried out complies with the plans and specifications and to demonstrate it. Delivery schedule The contractual duration for the completion of all work is 40 working days. The discharge pipe must be operational by November 27, 2026, at the latest.

GC Bidding

$500,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
239
Bidding Soon
3,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

October 2, 2026

Project location map

To Be Determined, Les Cedres, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.