Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 24, 2026

Site work and paving for a military facility in Woodbine, Georgia. Completed plans call civil work for a military facility.

Road resurfacing of the Naval Base Kingsbay facility including paving, grading, and associated infrastructure site work. SCOPE OF WORK Contractor will provide all labor, materials, equipment, and incidentals for the purpose of full width milling and repaving 1.5" (165 #/sy) of 12.5 mm superpave asphalt, thermoplastic striping, loop detectors and replacing pavement markers on specified roads (Approximately 1.48 centerline miles). All deceleration lanes will be included. Temporary paint markings will be required after resurfacing as indicated in section 653 of GDOT specifications to include stop bars, cross walks, railroad crossings, edge lines, lane lines and center lines. All work to be done in accordance with the Georgia Department of Transportation Standard Specifications Construction of Transportation Systems, Current Edition (2021), Supplemental Specifications and Special Provisions for all bid line items to include. Weblink address indicated below. Milling shall be variable depth (1.5" typical) which will require no land disturbing activities for earth shoulder building and grassing items . Milling in some areas may require a 2 ' mill head to accomplish milling adequately. Care must be taken to avoid damaging manhole lids, water valves, etc. CONTRACTOR will have discretion on removing any manhole covers and rings and water valve jackets . If removed, temporary covers will be of adequate size and strength to ensure no material enters the voids. After re-installation, a final inspection will be conducted to ensure no obstructions exist. Intersecting roadways will have a smooth transition to the original pavement. Millings shall belong to the County and will be hauled and dumped by the CONTRACTOR to a location no more than ten (10) miles away. Millings delivered to the County should be free of large chunks of asphalt roadway, material should be no larger than a No. 3 sieve or 2 inches. QUESTIONS: regarding this project may be directed in writing to the Purchasing Officer, Kelsey Kelley, at 200E. 4th Street, Woodbine, Georgia 31569. All questions shall be received by October 5th 2026 and answered by October 8th 2026. Questions must be emailed to bids@camdencountyga.gov .

GC Bidding

$1,100,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
50
Bidding Soon
899
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

December 14, 2026

Project location map

200 East 4th Street, Woodbine, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed