Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Site work and new construction of a playground / park / athletic field in Bluefield, West Virginia. Working plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

**As of October 9th, 2026, no bids were received. No definite date for the rebid** The Work is defined in full by Exhibit A Foundation Bid Specification and Exhibit B - detail drawings, which govern. The summary below is for convenience only; where a conflict exists, the Exhibits control. Site prep and excavation, stepped to follow the north-to-south slope; strip topsoil/organics; stockpiled. Stepped footings/foundation walls ARE ALLOWED at the contractor's option where practical. Continuous reinforced perimeter footing (24" wide) and stepped stem wall ( 16" stem with 8" log-seat at top and an interior bench/ledge); overall height 4'-7", bench 3'-6 1/2 " above bottom of footing. Independent, isolated footing at the fireplace end, separated from new work by a full-height vertical isolation joint. Continuous 16" interior curtain wall on the centerline (~23 '- 10"), overall height 3'-6 1/2 ", with 16"x8" crossvent openings. Reinforcement per Exhibit A / details: footing 2-#4 continuous; walls #4 vertical @ 24" o.c.; #4 horizontal top, middle, and bottom; minimum 3" cover against earth. Concrete: 4,000 psi minimum at 28 days, air-entrained. Crawlspace drainage: perimeter footing drain in washed stone + filter fabric to daylight/sump; gravel drainage layer; exterior dampproofing; 6-mil ground vapor barrier; foundation venting. Bottom of exterior footings to 36" below adjacent finished grade min. (or on sound rock where shallower); 12" min. into undisturbed soil. Submit all questions in writing to the Owner contact no later than September 21 , 2026. Answers and any changes will be issued by written addendum to all bidders. New reinforced-concrete foundation (perimeter stem wall, interior curtain wall, fireplace isolation) for a reassembled two-story historic log cabin CONCRETE & EXCAVATION SCOPE ONLY Concrete and excavation for a new reinforced-concrete foundation for the Davidson Cabin. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond.

Final Planning

$150,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
77
Bidding Soon
1,125
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2026

April 9, 2027

Project location map

2000 Stadium Dr, Bluefield, WV


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed