Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 22, 2026 at 8:00 PM
Updated September 25, 2026
Site work and new construction of a playground / park / athletic field in Bluefield, West Virginia. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
The Work is defined in full by Exhibit A Foundation Bid Specification and Exhibit B - detail drawings, which govern. The summary below is for convenience only; where a conflict exists, the Exhibits control. Site prep and excavation, stepped to follow the north-to-south slope; strip topsoil/organics; stockpiled. Stepped footings/foundation walls ARE ALLOWED at the contractor's option where practical. Continuous reinforced perimeter footing (24" wide) and stepped stem wall ( 16" stem with 8" log-seat at top and an interior bench/ledge); overall height 4'-7", bench 3'-6 1/2 " above bottom of footing. Independent, isolated footing at the fireplace end, separated from new work by a full-height vertical isolation joint. Continuous 16" interior curtain wall on the centerline (~23 '- 10"), overall height 3'-6 1/2 ", with 16"x8" crossvent openings. Reinforcement per Exhibit A / details: footing 2-#4 continuous; walls #4 vertical @ 24" o.c.; #4 horizontal top, middle, and bottom; minimum 3" cover against earth. Concrete: 4,000 psi minimum at 28 days, air-entrained. Crawlspace drainage: perimeter footing drain in washed stone + filter fabric to daylight/sump; gravel drainage layer; exterior dampproofing; 6-mil ground vapor barrier; foundation venting. Bottom of exterior footings to 36" below adjacent finished grade min. (or on sound rock where shallower); 12" min. into undisturbed soil. Submit all questions in writing to the Owner contact no later than September 21 , 2026. Answers and any changes will be issued by written addendum to all bidders. New reinforced-concrete foundation (perimeter stem wall, interior curtain wall, fireplace isolation) for a reassembled two-story historic log cabin CONCRETE & EXCAVATION SCOPE ONLY Concrete and excavation for a new reinforced-concrete foundation for the Davidson Cabin. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond.
Sub-Bidding
$150,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2026
October 26, 2026
2000 Stadium Dr, Bluefield, WV
Related To This Project
Bluefield, WV
Bid Date: Sep 21 2026
Bluefield, WV
Bid Date: Sep 25 2026
Bluefield, WV
--
Bluefield, WV
--
Bluefield, WV
--
Bluefield, WV
Bid Date: Aug 19 2026
Bluefield, WV
Bid Date: Aug 19 2026
Bluefield, WV
Bid Date: Jun 22 2026
Bluefield, WV
Bid Date: Jun 22 2026
Bluefield, WV
Bid Date: May 01 2026
Bluefield, WV
Bid Date: May 27 2026
Bluefield, WV
Bid Date: May 01 2026
Bluefield, WV
Bid Date: May 01 2026
Bluefield, WV
Bid Date: Mar 31 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
