Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Renovation of an educational facility in Shalimar, Florida. Completed plans call for the renovation of a 4,300-square-foot educational facility.

This project consists of a major renovation to the old Cafeteria and Kitchen Building which entails conversion of the space into three new classrooms with supporting offices and storage, a new clinic and new restrooms. All areas will receive new finishes and a new HVAC system. The Contractor shall provide all labor, materials, all testing (except forensic), general condition items (temporary facilities), and equipment necessary and shall be responsible for the completion of the entire construction package as described. The Contractor must perform the Work in accordance with the project plans and specifications and in no way does this general scope relieve the Contractor from the obligations required by the Contract Documents. All work is to comply with the rules and regulations of governing bodies having jurisdiction. Work shall be performed by skilled tradesmen having experience in performing the work. Each Contractor is responsible to review the site and be familiar with all existing conditions within. Each Contractor shall field verify dimensions, materials and conditions. Initial Layout to establish control points and grades will be performed by others and provided to the Contractor. The Contractor is responsible for all detailed layout, lines and grades from the indicated benchmark and control points required for proper location and coordination of work described and shall be responsible for maintaining control points and grades after the initial lay-out. All references in the Specification for direction from the Architect, Engineer of Owner should come through the TPM (Jacobs/Titan). Any conflicting assignment of work between the specifications, notes on the drawings and direction from the TPM work scope the TPM work scope will prevail. General Contractors shall include all conduit, junction boxes, outlet boxes, bushings, and pull strings for all structured cabling, fire alarm wiring, and camera wiring.

GC Bidding

$1,000,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
46
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2026

November 12, 2026

Project location map

1350 Joe Martin Cir, Shalimar, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed