Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 2, 2026

Demolition, site work and renovation of an educational facility in Salina, Kansas. Completed plans call for the demolition of a educational facility; and for the renovation of a educational facility.

PROJECT SCOPE a. Demolition of existing aluminum window units. b. Demolition of existing partial areas of stud walls. C. Installation of new exterior walls consisting of 5/8" fire-rated gypsum board over 6" metal studs (with 6" batt insulation within) over 5/8" densglass sheathing over vapor barrier over 2" rigid insulation board with eifs system over. d. Installation of new fixed tempered, tinted, insulated aluminum window units. e. Alternate # 1 for installation of hinged-panel dual glazed blind system at all new window units Bonds: 5% Bid Bond.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
21
Bidding Soon
310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2026

May 24, 2027

Project location map

650 E Crawford St., Salina, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed