Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 21, 2026 at 8:00 PM

Updated October 26, 2026

Demolition, site work, new construction and renovation of a mixed-use development in Gillette, Wyoming. Completed plans call for the construction of a 212,000-square-foot educational facility; and for the demolition of a 300,000-square-foot educational facility.

Campbell County High School Phases 3-5 Redevelopment of the Campbell County High School campus, including demolition of the existing high school, site development, new parking, and construction of a new 212,000 square foot high school facility featuring concrete, steel, masonry, and metal framing construction, interior fit-outs for educational and athletic spaces, and utility relocations. Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 10/12/2026 at 1:00 PM MT Bidders and sub- bidders having questions, requiring clarification, interpretation or any RFIs regarding the procurement documents shall make a written request via email to Plan One - Taylor Lee at tlee@planone.com, with a copy to Sean Mathes at smathes@ccsd.k12.wy.us and Austin Rosenthal at austin.rosenthal@artaicgroup.com. Phase 3 includes the demolition of the existing athletic fields and facilities following the 2026 Fall sports season, utility relocations and modifications, earthwork and site development, aggregate piers, superstructure typical of public education facilities including concrete, steel, masonry and metal framing. Interior fit out of facilities including educational spaces, administrative offices, cafeteria and athletics. The total SFD appropriated scope area is equal to 191,662 Square Feet and has a capacity for 1200 Students. CCSD intends to also include enhancements to the project including a primary Gym , an Auxiliary Gym, Weight Room and Cooling capacity for the primary Gym . The total square footage for these enhancements is 20,500, bringing the building total to approximately 212,000 square feet. Phase 4 includes demolition of the existing approximately 300,000 sf high school after students and staff have relocated to the new high school. Phase 5 consists of site development, new parking lot and drives, landscaping and site amenities in the footprint of the former school to support the new campus functions.

GC Bidding

$92,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
13
Bidding Soon
113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2026

December 1, 2026

Project location map

1000 Camel Dr, Gillette, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed