Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2026 at 8:00 PM

Updated October 26, 2026

Site work and paving for a mixed-use development in Smithville, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

This project will consist of construction of a single lane roundabout at the intersection of Bridge Street, 1st Street, and Hilltop Street, full depth asphalt and concrete road construction, mill & overlay, pedestrian facilities, sidewalk curb ramps, and drainage/storm sewer improvements. The City reserves the right to reject any and all bids, offers, or proposals submitted, or to advertise for new bids with the MoDOTs concurrence. The City reserves the right to defer the acceptance of any proposal and the execution of a contract for a period not exceeding one hundred twenty (120) days after the date of opening of the bids. The successful bidder to whom the contract has been awarded shall sign the contract and performance bond and other required certificates in triplicate and return the signed documents within fifteen (15) days after the date of their receipt. MODOT - Bridge Street Roundabout Improvements All questions concerning the bid document preparation can be directed to Matt Bond at 816-532-3897. Project specific questions can be directed to Thomas Renfro at trenfro@gbateam.com.

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2026

January 4, 2027

Project location map

Multiple Locations, Smithville, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed