Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 8, 2026

Demolition, site work and new construction of a bridge / tunnel in Russiaville, Indiana. Completed plans call for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Removal of the existing 16-foot long concrete structure and installation of a new, prestressed concrete NEXT beam, Type 28D bridge. Additional work includes installation of new guardrail and guardrail transitions in all four quadrants, new PF-1 bridge railing, and placement of new riprap for scour countermeasures. Bonds: Bid Bond required (unspecified amount).

GC Bidding

$750,000.00

Public - County

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
104
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2026

February 4, 2027

Project location map

0.38 miles north of SR 26, Russiaville, IN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed