Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 12, 2026

Site work and renovation of a water / sewer project in Wheeling, West Virginia. Completed plans call for the renovation of a water / sewer project.

Removal and replacement of generator equipment at the Water Pollution Control Department facility. The project is located in the City of Wheeling, Ohio County, West Virginia. The project site is at the City of Wheeling Water Pollution Control Division (WPCD) located at 2516n Main Street, Wheeling, WV 26003 COMPLETION DATE: APRIL 26, 2027 A. The WPCD Gate 1 Electrical Improvements BP07, Generator Replacement Project - Construction Contract includes the complete installation, integration, and commissioning of a fully furnished emergency power system including generators, fuel equipment, and switchgear. B. The Work under this Contract includes, but is not limited to 1 . Installation of all equipment and accessories 2. Structural modifications and supports (if any) required for installation 3. Installation of mechanical piping systems, valves, and appurtenances 4. Electrical work, including conduit, wiring, terminations , and integration with control panels 5. Instrumentation installation and calibration 6. System integration, testing, and commissioning 7. Coordination with the Equipment Vendor and Manufacturer's field services 8. Startup assistance and operator training support C. The Contractor will furnish, install , integrate, test, commission, and place into satisfactory operation the complete emergency power system shown and specified, including generators, generator accessories , fuel-system equipment, switchgear, automatic transfer equipment, controls, instrumentation, communications, supports, wiring, conduit, piping, and other appurtenances required for a complete and operational installation. D. The Construction Contract includes the complete construction, installation, integration, testing, commissioning, and startup of the Generator Replacement Project in accordance with the Contract Documents. The Work includes, but is not limited to the following: Field verification and documentation of existing electrical , structural, mechanical , fuel , control , and site conditions. Preparation and implementation of a detailed sequence of construction, temporary-power plan, outage plan, and final cutover plan. Provision, placement, connection, operation, fueling, maintenance, testing, and removal of temporary generation required to maintain designated emergency plant loads during construction. Selective demolition and lawful removal or Owner-directed salvage of existing generators, switchgear, controls, fuel equipment, piping, conduit, wiring, supports, housekeeping pads, and appurtenances shown or specified for removal. Installation of new generators and associated starting, charging, cooling, combustion-air, exhaust, silencing, fuel , monitoring, and control systems. Installation of switchgear, automatic transfer equipment, distribution equipment, protective devices, grounding and bonding, raceways, conductors, terminations, controls, and communications. Structural modifications, equipment pads, housekeeping pads, supports, anchors, penetrations, sleeves, firestopping, patching, painting, and restoration. Integration with existing plant electrical systems, automatic transfer systems, SCADA, alarms, and other controls shown or specified. Manufacturer field services, startup, field testing, load-bank testing, functional testing, transfer testing, commissioning, operator training, and correction of deficiencies. Record drawings, operating and maintenance manuals, test reports, training documentation, spare parts, and closeout deliverables. For the existing generators, offer first right-of-refusal to the Owner for any equipment slated for salvage. Upon approval , salvage any usable components. If salvage is not possible, remove and dispose. Receiving and inventorying equipment delivered to the site. Inspection for damage upon delivery and notification to Owner Offloading, rigging, and placement of equipment. Installation of: 1) Generators 2) Exhaust Silencers 3) Fuel tank 4) Day tanks 5) Switchgear 6) Lighting . Installation of all associated fuel piping systems. . Electrical connections to all equipment and systems. Integration of local and main control panels with plant control systems. Installation of equipment supports, anchors, and appurtenances. Coordination of all interfaces between equipment and building systems. Testing, startup, and commissioning of the complete system. All questions during bidding should be addressed to Corey Zachel , P.E., at Verdantas LLC, 2001 Main Street, Suite 600 Wheeling, WV 26003, at czachel@verdantas.com

Sub-Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
172
Bidding Soon
2,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

2516 Main St, Wheeling, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed