Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 14, 2026 at 8:00 PM

Updated October 26, 2026

Site work and renovation of a mixed-use development in Essexville, Michigan. Completed plans call for the renovation of a educational facility; for site work for a educational facility; swimming pool; swimming pool; and water / sewer project.

Garber High School Natatorium - Pool Mechanical & Main Drain Repairs -- Essexville-Hampton Public Schools (E-HPS) is now accepting sealed bids for pool mechanical and main drain repairs on the at Garber High School Natatorium located at 213 Pine St, Essexville MI 48732. 1. Replacement of the existing 6" modulation valve on the main drain line. 2. Supply and installation of a new CAT 4000 chemical controller (or approved equal), complete with flow cell, acid pump, and chlorine pump. 3. Supply and installation of a flow meter integrated with the new CAT 4000 chemical controller. 4. All labor, materials, and equipment necessary for a complete and functional installation. 5. Testing, calibration, and startup of the new chemical controller and flow monitoring system. 6. Site protection and pool safety measures during construction. Alternate No. 1 - Main Drain Abandonment and Reroute As an alternate to the Base Bid main drain valve replacement, respondents shall provide a separate price for the following scope, which reroutes the main drain system rather than repairing the existing corroded line: 1. Obtain a variance from EGLE for the proposed main drain reconfiguration. 2. Drain the pool and abandon the existing main drain line in place (or remove, if required by EGLE or the District). 3. Supply and install new wall-mounted main drains. 4. Core the pool wall at two (2) locations as needed to maintain EGLE-required dimensions and clearances. 5. Seal all wall penetrations with link seals to ensure a water-tight installation. 6. Supply and install new Schedule 80 PVC piping from the pool wall to the balance tank. 7. Provide all necessary pipe support in accordance with manufacturer and code requirements. 8. Coordinate pool draining/refilling and downtime with the District's athletic and aquatics schedule. Question Deadline 10/16/2026 at 1:00 PM ET Written Questions - Online portal.

Post-Bid

$200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
114
Bidding Soon
1,412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

213 Pine St, Essexville, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed