Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated October 20, 2026

Site work for a municipal facility in Piqua, Ohio. Completed plans call for site work for a municipal facility.

No performance bond is required STREETS DEPT. AUTOMATED GATE The City of Piqua is accepting bids from qualified and experienced contractors for the furnishing and installation of a new automated security gate at the City of Piqua Public Works Department, located at 859 S. Main Street, Piqua, Ohio 45356. The successful contractor shall furnish all labor, materials, equipment, supervision, and incidental items necessary to provide a complete, operational , and professionally installed automated gate system in accordance with the requirements outlined below. All work shall be performed in a professional and workmanlike manner and in accordance with applicable federal, state, and local codes, regulations, and manufacturer requirements. 1. AUTOMATED GATE SYSTEM The contractor shall furnish and install one horizonal 26'- 0" x 7' -0" gate as shown in Exhibit A. The automated gate system shall include, at a minimum: A. Safety and Operating Equipment 1. One (1 ) flashing warning strobe. 2. Safety sensors appropriate for the automated gate system. 3. Free-exit safety loops. 4. All necessary controls, wiring, hardware, and accessories required for a complete and operational system. 5. The gate operator shall be programmable to allow the gate to remain in the open position during designated periods, as directed by the City.2. One (1) long-range vehicle access reader. 3. Fifty (50) vehicle access tags for City of Piqua vehicles. 4. One ( 1) wireless receiver capable of allowing authorized personnel to open and operate the gate using a mobile phone or other compatible device. 5. Contractor shall program and test all access-control equipment to verify proper operation prior to final acceptance. 2. ELECTRICAL REQUIREMENTS 1. A dedicated 120 -volt, 20-amp electrical circuit shall be provided by the City/Others at the designated gate location. 2. The contractor shall be responsible for all electrical connections, wiring, controls, and other electrical work necessary from the point of connection to the gate operator and associated equipment. 3. All electrical work performed by the contractor shall comply with applicable electrical codes and manufacturer requirements. 4. The contractor shall coordinate with the City regarding the location and availability of the electrical service prior to installation. 3. CONCRETE PAD 1. The contractor shall coordinate the required pad dimensions, location, anchor-bolt configuration, and other installation requirements with the gate manufacturer prior to construction. 2. The contractor shall verify that the concrete pad is suitable for installation before mobilizing equipment. 3. Any required modifications to the concrete pad resulting from contractor or manufacturer requirements shall be identified to the City prior to commencement of work. The contractor shall furnish and install: 4. BOLLARDS 1. Four (4) 6 5/8" diameter x 6' high yellow-sleeved bollards. 2. Bollards shall be securely installed and positioned to provide protection for the gate operator and associated equipment while maintaining required vehicle access and gate operation.5. DEMOLITION AND SITE PREPARATION The performing contractor shall be responsible for all demolition and site preparation associated with the project. This shall include, but not be limited to: Removal of existing fencing, gates, posts, hardware, concrete, or other obstructions as necessary to complete the installation. Disposal of demolition materials in accordance with applicable regulations. o o Preparation of the work area necessary for installation. Restoration of disturbed areas resulting from the contractor's work. Removal of all construction debris and excess materials from the site upon completion. No additional compensation will be made for demolition or site preparation that is reasonably necessary to complete the project unless specifically authorized in writing by the City. 6. GATE POSTS AND EXISTING FENCE The contractor shall furnish and install: 1. Two (2) 4" gate posts as required for the new automated gate installation. 2. The contractor shall tie the existing chain-link fence into the new gate posts. 3. All connections between the existing fence and new gate installation shall be secure, professional in appearance, and suitable for the intended use. 4. Contractor shall field-verify existing conditions prior to submitting a bid. Question Deadline 10/22/2026 at 3:00 PM ET Contact Bob Graeser, at 937-606-0822 or via e-mail bgraeser@piquaoh.gov with any questions regarding the specifications

Sub-Bidding

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
161
Bidding Soon
2,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2026

November 30, 2026

Project location map

859 S Main St, Piqua, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed