Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 23, 2026

Site work and new construction of a road / highway in Gering, Nebraska. Completed plans call for the construction of a road / highway.

This project consists of directional boring of approximately 5490 linear feet of electrical innerduct. Construction Method. a. General Requirements. Innerduct shall be placed by directional drilling in accordance with the lines, grades, details, and dimensions shown on the plans or as otherwise approved by the Owner. b. Installation. i. Installation procedures shall conform to the procedures specified by the innerduct manufacturer. ii. All innerduct shall be installed at a minimum depth of four (4) feet iii . Conduits will be placed no more than one ( 1) foot away from front left corner of existing transformers. In and out tails will be a minimum of three (3) feet above ground. iv. Contractor must field verify and locate all existing utilities including bury depth prior to construction. v. Contractor must cap or tape ends of conduit after installation to prevent intrusion of outside materials. The successful bidder is allowed 45 calendar days to complete the project from the date of the Notice to Proceed. Liquidated damages will be assessed at $50 for each consecutive calendar day for which the work is not complete. Anticipated Notice to Proceed will be October 27, 2026.

Post-Bid

$138,600.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
11
Bidding Soon
252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

October 27, 2026

Project location map

Multiple Locations, Gering, NE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed