Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 10, 2026

Site work and outdoor lighting for a playground / park / athletic field in Boston, Massachusetts. Conceptual plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

Design services for enhancements to the playground including the stairs and new shade structure, and modernization of the sports lighting at Christopher Lee Playground. The method of Contractor Selection has not been Determined at this time. Requests for proposals for design services is underway.

Conceptual

$2,700,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
706
Active Projects
337
Bidding Soon
4,622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2027

Project location map

775 E First St, Boston, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed