Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 22, 2026 at 8:00 PM
Updated October 24, 2026
Site work and renovation of a mixed-use development in Slave Lake, Alberta. Completed plans call for the renovation of a municipal facility; and playground / park / athletic field.
PROJECT BACKGROUND: The BCBC (Boreal Centre for Bird Conservation) is a Gold Leeds building that incorporates an inverted roof supported by Glue Lam Beams and Cable Trusses. Winter snow load was very excessive stretching the cables, lowering the center of the inverted roof line by 4 inches. PROJECT OBJECTIVE: Raise the trusses and tighten the threaded swage connecters at each cable end to lift the roof back into place. SCOPE OF WORK: Contractor is responsible for all necessary equipment, tradesmen, and supplies for the completion of the following scope of work: 1. Blocking to be installed between the individual top chord 2x8 members. Blocking will be spaced no further than 1.5m apart along the length of the top chords. Blocking to be installed prior to raising the trusses with oversight from a professional engineer, supplied by parks. 2. Shore each truss at the mid-span to incrementally lift trusses a total of inches vertically. Shoring to be raised so that adjacent trusses are lifted simultaneously, avoiding differential height changes of more than 2 inches between adjacent trusses. 3. Cables to be tightened while the trusses are slowly raised, equally at each end of the truss. Tighten each cable one-half rotation before tightening the next cable to maintain equal tension between cables. The cables are to be tightened slowly and evenly until load on the shoring has been reduced, this is tested by dropping the shoring slightly, the truss should settle only slightly once the cable has reached an ideal tension. 4. This procedure will be overseen by a professional engineer supplied by Parks. All debris and garbage disposal is the responsibility of the contractor. Please submit any questions by October 26, 2026 at Noon .
GC Bidding
$100,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2026
November 10, 2026
742048 AB-88, Slave Lake, AB
Related To This Project
Slave Lake, AB
Bid Date: Oct 30 2026
Slave Lake, AB
Bid Date: Oct 15 2026
Slave Lake, AB
Bid Date: Oct 16 2026
Slave Lake, AB
Bid Date: Oct 16 2026
Slave Lake, AB
Bid Date: Sep 29 2026
Slave Lake, AB
Bid Date: Sep 29 2026
Slave Lake, AB
Bid Date: Sep 15 2026
Slave Lake, AB
Bid Date: Jun 26 2026
Slave Lake, AB
Bid Date: Jun 29 2026
Slave Lake, AB
Bid Date: Jun 30 2026
Slave Lake, AB
Bid Date: Jun 18 2026
Slave Lake, AB
Bid Date: Apr 20 2026
Slave Lake, AB
Bid Date: May 20 2026
Slave Lake, AB
Bid Date: May 27 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed