Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 30, 2026 at 8:00 PM

Updated November 2, 2026

Demolition, site work, renovation and addition to a civil project in Palmyra, Missouri. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

WWTP Improvements - includes rehab to both existing clarifiers, proposed building addition over existing influent channel, relocation of the mechanical screen, proposed gravity sewer upgrades, additional manholes, new oxidation ditch blower building, all associated tie-ins and piping, structural work, electrical and controls. Work includes any bypass pumping required, site work, miscellaneous earth work, sludge removal as required to install the improvements. Work also includes related demolition, piping, valves, electrical, controls and appurtenances, manholes, electric,, site piping, site grading, and site work required for fully functioning and operational renovations. Goals for female participation in each trade 6.9% Question Deadline 11/20/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by the ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered

GC Bidding

$5,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
65
Bidding Soon
770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2026

February 1, 2027

Project location map

Hwy 61,, Palmyra, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed