Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 10, 2026 at 7:00 PM
Updated November 13, 2026
Renovation of a communication facility in Plant City, Florida. Completed plans call for the renovation of a communication facility.
Removal and replacement of existing standby generator system serving the municipal communication tower to ensure reliable power for critical utility infrastructure monitoring and control systems. Question Deadline 11/16/2026 at 2:00 PM ET Online question deadline The Contractor shall furnish all labor, materials, equipment, tools, transportation, and services necessary to provide and install a complete standby power system for the communication tower, including a standalone diesel generator, automatic transfer switch (ATS), generator pad, testing, and all associated electrical work. Work shall include, but not be limited to, the following: Furnish and install one (1) EPA-certified diesel standby generator, rated 14 kW, 1.0 PF,60 Hz, single-phase, 120/240V. Generator shall be a factory-assembled, weather-proof, sound-attenuated unit suitable for outdoor installation. Provide sub-base fuel tank sized for a minimum of 48 hours of runtime at the specified load. Provide all manufacturer-required accessories including battery, battery charger, block heater, vibration isolators, and control panel. Provide sound-attenuated enclosure meeting applicable noise-reduction requirements. Furnish and install an Automatic Transfer Switch (ATS) sized for the generator and tower electrical load. ATS shall be provided by the generator manufacturer. Provide and install all conduit, conductors, grounding
GC Bidding
$450,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2026
January 4, 2027
Multiple Locations, Plant City, FL
Related To This Project
Plant City, FL
Bid Date: Nov 19 2026
Plant City, FL
Bid Date: Oct 13 2026
Plant City, FL
Bid Date: Oct 22 2026
Plant City, FL
Bid Date: Oct 08 2026
Plant City, FL
Bid Date: Sep 16 2026
Plant City, FL
Bid Date: Sep 09 2026
Plant City, FL
--
Plant City, FL
--
Plant City, FL
Bid Date: Jul 09 2026
Plant City, FL
--
Plant City, FL
Bid Date: Jul 16 2026
Plant City, FL
Bid Date: May 27 2026
Plant City, FL
Bid Date: Apr 30 2026
Plant City, FL
Bid Date: May 14 2026
Plant City, FL
Bid Date: Jun 16 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed