Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2026 at 7:00 PM

Updated November 11, 2026

Site work and renovation of a water / sewer project in West Memphis, Arkansas. Completed plans call for the renovation of a water / sewer project.

The work consists generally of design, integration, equipment, installation and software for improvements to the Water Plant control system. More specifically, the major elements the selected vendor will supply are outlined below Control System / SCADA Upgrades PLC upgrade to Allen-Bradley CompactLogix platform. West Memphis' current plant PLC, Micrologix 1400, is an active mature product which cannot be upgraded and will soon be obsolete. The new platform shall have additional input and outputs for motor current transducers, transfer and finished flow meters and chemical flow pacing, as well as room for expansion as the water treatment plant grows in the future. Replacement of the existing panel mounted Operator Interface with a new monitor, PC with Rockwell Automation FactoryTalk View Site Edition software. Add a second PC with HMI software, alarm notification software in the administration building for full redundancy to the panel mounted system and ability to separate the alarm notification for the water system from the electric system. The intent is for the new system to provide full inhouse control of alarm notification. Add current transducers to transfer, high service and well pumps. Add real time continuous chlorine and pH monitoring systems. Provide all necessary wiring, equipment installation, and/or power connections by licensed electrician as required. Please direct all inquiries and request for Bid Packets to Water Superintendent, Jerry Burns , 604 East Cooper West Memphis , AR 72301, by phone at 870-732-7673 or by email at jburns@westmemphisar.gov. Implementation of Supervisory Control and Data Acquisition (SCADA) system improvements at the Water Treatment Plant.

Post-Bid

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
85
Bidding Soon
812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

December 7, 2026

Project location map

604 East Cooper, West Memphis, AR

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed