Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 7, 2026 at 7:00 PM
Updated November 12, 2026
Renovation of a financial development in Camrose, Alberta. Completed plans call for the renovation of a financial development.
Camrose AFSC Building 2nd Floor Kitchen Restoration Project Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 11/12/2026 at 4:30 PM MT Questions are submitted online 1. Hazardous Materials Abatement (to be completed first) . Identify, safely remove and properly dispose of hazardous materials present within the affected areas prior to any demolition or restoration work. Provide containment, negative air / air monitoring, removal, handling, transportation and disposal in accordance with the Alberta OHS Code, Alberta Asbestos Abatement Manual and all applicable environmental requirements. Abatement work to be carried out by a qualified abatement contractor; provide worker certifications, notifications (Notice of Project where required), waste manifests and clearance / visual inspection reports on completion. Hazardous materials assessment report(9212HAZ01KH ) to be provided by Edon Management at the end of this RFP. All Cascade Environmental Reports attached to this bid document are for reference only. Bidders are to base their price on the items identified in that report. Leave all abated areas clean , safe and ready for subsequent repair work. 2. Kitchen Cabinet Repair and Restoration (2nd Floor Kitchen). Repair and restore the kitchen cabinets affected by water damage. Inspect cabinets and surrounding areas (walls, backsplash, countertop substrate) for moisture-related damage and report findings to the Project Manager before proceeding. Remove and replace damaged cabinet components (boxes, gables, kick plates, shelving) as required; repair or re-secure cabinet doors, drawers and hardware. Restore affected surfaces to match the existing cabinetry in material, colour, profile and finish. Clean the work area and dispose of all damaged materials upon completion. 3. New Sink and Faucet/Tap Assembly (2nd Floor Kitchen). Supply and install a new sink and faucet/tap assembly in the designated area. Remove and dispose of existing fixtures; prepare the countertop / cabinet opening as required. Install new stainless steel sink and commercial-grade faucet; connect to existing water supply and drainage lines, including new supply stops, P-trap and tailpiece as required. Seal around the sink; test all connections for proper operation and leaks; clean the work area . Sink and faucet selection to be submitted to the Project Manager for approval prior to ordering. 4. New Vinyl Flooring (2nd Floor Kitchen / Designated Area). Supply and install new vinyl flooring in the designated area. Remove existing damaged flooring as required; prepare and level the subfloor and repair minor surface deficiencies. Install new commercial-grade vinyl flooring per manufacturer's specifications, including underlayment, transitions, base and trim as required. Ensure all seams and edges are properly secured and the finished flooring is clean, level and free of defects. Flooring product and colour to be submitted to the Project Manager for approval prior to ordering. 5. Ceiling Drywall Repair (Upper Crawlspace). Repair and restore water-damaged ceiling drywall in the upper crawlspace. Remove damaged drywall and any affected materials; inspect the area for moisture or additional damage and allow it to dry completely (moisture readings to be documented) before closing in . Repair any underlying issues identified; install new drywall, tape, finish and sand the joints, then prime and paint to match the existing ceiling. Clean the work area and dispose of all damaged materials upon completion. 6. Wood Framing Repair (Upper Crawlspace). Repair and restore water-damaged wood framing in the upper crawlspace. Inspect framing for moisture damage, rot, deterioration or loss of structural integrity and report findings to the Project Manager before proceeding. Remove and replace damaged wood members as required; reinforce or re-secure framing where necessary. Allow the affected area to dry thoroughly before completing repairs. Restore the framing to a safe and serviceable condition; remove damaged materials and clean the work area upon completion. 7. Basement Dirt Floor Remediation. Address and repair the existing dirt floor in the basement. Remove loose or unsuitable soil (4" to 6"and debris; grade and level the floor surface; address any areas affected by moisture or water infiltration. Conduct cleaning of concrete foundation walls and enzyme treatment (or other appropriate application) of soil floor. Replace removed soil, as required. Where required, supply, place and compact appropriate fill material to provide a stable, clean and level base.
Sub-Bidding
$250,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2026
January 4, 2027
4910 52 St, Camrose, AB
Related To This Project
Camrose, AB
Bid Date: Nov 24 2026
Camrose, AB
Bid Date: Nov 03 2026
Camrose, AB
Bid Date: Oct 02 2026
Camrose, AB
Bid Date: Sep 25 2026
Camrose, AB
Bid Date: Sep 17 2026
Camrose, AB
Bid Date: Sep 03 2026
Camrose, AB
Bid Date: Sep 02 2026
Camrose, AB
Bid Date: Aug 28 2026
Camrose, AB
Bid Date: Aug 26 2026
Camrose, AB
Bid Date: Aug 11 2026
Camrose, AB
Bid Date: Jul 21 2026
Camrose, AB
Bid Date: Jul 27 2026
Camrose, AB
Bid Date: Aug 04 2026
Camrose, AB
Bid Date: Apr 15 2026
Camrose, AB
Bid Date: Apr 22 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed