BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated November 1, 2025

Site work and new construction of an industrial development in Anson, Maine. Completed plans call for the construction of a 4,000-square-foot industrial development.

All questions pertaining to the submission of your Proposal, including apparent omissions or conflicting RFP Documents shall be submitted in writing to jenna.almquist@mwhconstructors.com. Requests for RFP documents and questions can be directed through email to jenna.almquist@mwhconstructors.com. This work package includes the design, furnishing, and construction of a weathertight pre-engineered metal building. In addition to the building envelope, this work includes all interior walls and ceilings. MWH Constructors, as the Construction Manager at Risk, is requesting proposals for the Pre-engineered Metal Building for the Lagoon Aeration & Tertiary Treatment Upgrades Project starting in 2026 at the Anson Madison Sanitary District. As of October 7, 2025, construction is expected to start April 2026 and complete January 2027. The Project consists of the construction of a 4,000-square-foot pre-engineered metal building, utility infrastructure, and the installation of new treatment equipment. Generally, this work includes the design, furnishing, and construction of a weather tight pre-engineered steel building. In addition to the building envelope, this work includes all interior walls and ceilings. All labor, construction equipment, tooling, and permanent or temporary material required to perform the scope of work identified above is included. Please include in your project approach a minimum of three proposed interim milestones for the purpose of understanding your intent regarding sequence and to facilitate monitoring schedule adherence. The final interim milestones will be as mutually agreed and included in the subcontract Disclaimer/Agency Not a Party: This Contract is expected to be funded in whole or in part by the Maine Department of Environmental Protection (DEP), USDA Rural Development (USDA), Northern Borders Regional Commission (NBRC), and Congressionally Directed Spending through the EPA. This Contract contains requirements from all of these funding agencies. Neither the funding agencies, nor any of their departments, agencies, or employees is or will be a party to this contract. The word "agency" in the contract documents refers to these funding agencies. Award of any Contract will be contingent upon final financial agreements between the Owner and the funding agencies. Federal Provisions, such as American Iron & Steel and Davis Bacon and Related Acts apply to this Contract. A complete listing of Federal provisions is included in the Contract Documents. The project scope may be adjusted to match available funding.

Post-Bid

Industrial

$2,000,000.00

Public - State/Provincial

New Construction, Site Work

30

38

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
2
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2025

April 6, 2026

Project location map

41 Kennebec St, Anson, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.