Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2022 at 8:00 PM
Updated July 1, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Brunswick, Maine. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
UPDATE : https://www.brunswickme.org/ArchiveCenter/ViewFile/Item/142 Project is included Town of Brunswick FY 2023-2027 Budget CIP Page 07 ___________________________________________________________________________________________________ The project includes various amenities to the Department of Transportation's new curved bridge replacement project (currently the Frank J. Wood Bridge) that connects the Town of Brunswick to the Town of Topsham across the Androscoggin River. The scope of these amenities reflects the design recommendations of the Brunswick-Topsham Design-Advisory Committee (DAC) whose members were appointed by the Town governments. The advisory effort of the DAC was to create an even stronger connection between the two villages, showcase the scenic overlooks at both ends of the bridge, and celebrate the historic importance of this special site. Interpretive panels that memorialize the history of the site will be installed on both sides of the bridge as part of the bridge replacement project. Brunswick side of the new bridge: Redevelopment/enhancement of Anniversary Park - The improvements include a pathway leading to a newly created scenic Overlook area and a landscaped ampitheatre public park space. The existing structural brudge abutment will be utilized in the construction of the Overlook looking downstream. The project is included in the town's 2022-2026 Capital Improvement Program (CIP). As of December 3, 2021, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$330,000.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2022
To Be Determined, Brunswick, ME
Related To This Project
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: Mar 16 2022
Brunswick, ME
Bid Date: Apr 07 2022
Brunswick, ME
Bid Date: Sep 15 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
