Site work for a water / sewer project in Caribou, Maine. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Upgrading two (2) booster pump stations in Caribou, Maine. Includes demolition of existing doghouse roofs, construction of new buildings on existing foundations, new pumps, valves, piping, electrical and controls for the stations. Bids are requested for the following Contract: [Booster Pump Stations Upgrade Project #48603] Owner anticipates that the Project's total bid price will be approximately $[500,000]. The Project has an expected duration of [180] days or less for final completion. Contract Time will not commence to run until materials can be obtained. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 9:00 am and 4:00 pm and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Shipping costs will be $10 per set of bidding documents mailed. Bidding Documents are available for purchase in the following formats: FORMAT COST Bidding Documents (including Full-Size Drawings) $100 Bidding Documents (including Half-Size Drawings) $75 Compact Disc containing Bidding Documents in portable document format (PDF) $50 Electronic transfer of Bidding Documents from [via email, drop box, etc.] $50 Pre-bid Conference There will be no Pre-bid For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Some provisions that apply to this Contract include the following: American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron, and [add project specific waivers as applicable]. Disadvantaged Business Enterprise Requirements Each Bidder shall take special notice of the Guidance for use of Disadvantaged Business Enterprise in the DWSRF Supplemental General Conditions. Failure to complete these requirements may result in finding that the Bidder is nonresponsive and therefore, not eligible to be awarded this contract. Complete requirements are located in the Bid Documents. Nondiscrimination in Employment and Labor Standards Bidders on this work will be required to comply with the President's Executive Order No. 11246 and amendments and supplements to that Order. The requirement for Bidders and CONTRACTORS under this Order are located in the DWSRF Supplemental General Conditions. Davis-Bacon Requirements Davis-Bacon and Related Acts are requirements of this contract. Federal Requirements The Contractor must comply with the Department of Labor Regulations relating to Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by 29 CRF part 3, Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by 29 CFR part 5, Occupational Safety and Health Standards (OSHA) (29 CFR part 1910). The Contractor must comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S. C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Safe Drinking Water Act, and Executive Order

Award

Water / Sewer

$756,350.00

Public - City

Site Work

10

14

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
15
Bidding Soon
205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

March 3, 2023

Project location map

Multiple Locations, Caribou, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.