BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated July 1, 2025

Site work for a bridge / tunnel in Farmington, Maine. Working plans call for site work for a bridge / tunnel.

Shoulder width will be maintained and repair any damage from water erosion. Shoulders will be lower and graded at a slightly steeper cross slope to provide positive drainage to the ditch. If possible, the all-in slopes will be no steeper than 2:1 and the back slopes will be no steeper than 1:1. The depth of the ditch should be a minimum of 12" to 18" below the gravel base or follow the original ditch depth when constructed to maintain water flow to existing cross culverts and for water cutouts. The width of the bottom of the ditch will be 18" wide between the front slope and back slope and v-ditch should be avoided. No gravel of sod berm or windrow will be left in between the road and the ditch slope. The county will give the contractor places for ditch spoils. All culverts, geotextiles, and erosion control materials will be supplied by the County; however the contractor will pick up the material at County Way campus. Avoid any inconveniences to residents without prior notice given to them. The contractor will use proper warning signs in and around the work area and only close one lane at a time during construction. All unstable ditches and slopes will be properly protected against erosion according to best management practices and the contractor must be certified in that practice. Any exposed soil shall be stabilized with hay mulch at the end of the workday. All work will be performed under the direction of the Road Supervisor. All culverts or obstructions contractor will mark before work begins. The contractor will call Dig Safe before any work begins and provide the county with the dig safe permit number. A machine must have a hydraulic ditching bucket and not be any larger than a 23-ton excavator and no smaller than an 18-ton Excavator. The contractor shall avoid sharp turns on the hot top and avoid damage to the surface.

Final Planning

Bridges / Tunnels

$600,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
28
Bidding Soon
469
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

Project location map

Multiple Locations, Farmington, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.