Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2023 at 8:00 PM
Updated July 1, 2025
Site work for a bridge / tunnel in Farmington, Maine. Working plans call for site work for a bridge / tunnel.
Shoulder width will be maintained and repair any damage from water erosion. Shoulders will be lower and graded at a slightly steeper cross slope to provide positive drainage to the ditch. If possible, the all-in slopes will be no steeper than 2:1 and the back slopes will be no steeper than 1:1. The depth of the ditch should be a minimum of 12" to 18" below the gravel base or follow the original ditch depth when constructed to maintain water flow to existing cross culverts and for water cutouts. The width of the bottom of the ditch will be 18" wide between the front slope and back slope and v-ditch should be avoided. No gravel of sod berm or windrow will be left in between the road and the ditch slope. The county will give the contractor places for ditch spoils. All culverts, geotextiles, and erosion control materials will be supplied by the County; however the contractor will pick up the material at County Way campus. Avoid any inconveniences to residents without prior notice given to them. The contractor will use proper warning signs in and around the work area and only close one lane at a time during construction. All unstable ditches and slopes will be properly protected against erosion according to best management practices and the contractor must be certified in that practice. Any exposed soil shall be stabilized with hay mulch at the end of the workday. All work will be performed under the direction of the Road Supervisor. All culverts or obstructions contractor will mark before work begins. The contractor will call Dig Safe before any work begins and provide the county with the dig safe permit number. A machine must have a hydraulic ditching bucket and not be any larger than a 23-ton excavator and no smaller than an 18-ton Excavator. The contractor shall avoid sharp turns on the hot top and avoid damage to the surface.
Final Planning
Bridges / Tunnels
$600,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2023
Multiple Locations, Farmington, ME
Related To This Project
Farmington, ME
Bid Date: Jul 10 2023
Farmington, ME
--
Farmington, ME
Bid Date: Feb 09 2022
Farmington, ME
Bid Date: Apr 05 2022
Farmington, ME
Bid Date: Oct 16 2019
Farmington, ME
Bid Date: Feb 04 2021
Farmington, ME
Bid Date: Jan 20 2021
Farmington, ME
Bid Date: Jun 20 2023
Farmington, ME
Bid Date: Jul 06 2023
Farmington, ME
Bid Date: May 31 2023
Farmington, ME
Bid Date: May 16 2023
Farmington, ME
Bid Date: Mar 30 2023
Farmington, ME
Bid Date: Apr 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
