BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work and renovation of a water / sewer project in Hartland, Maine. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Work under this project includes, but is not limited to, all labor, materials, equipment, and incidentals for the Phase 3 upgrade of the Hartland Pollution Control Facility including general conditions and mobilization, temporary construction facilities, demolition and site clearing; structural excavation, trench excavation, ledge excavation and removal; earthwork, backfill, aggregates, crushed stone and compaction; site pavement, rip-rap, site restoration, erosion control and underdrain work; slabs, cast-inplace concrete; masonry, wood framed structures; structural steel, metal building improvements, metal roofing, metal siding, insulation, misc. metals, gratings, railings; rough and finish carpentry, chemical building construction, asphalt roofing, trusses, damp proofing and insulation; siding; fiberglass and steel doors and hardware; overhead doors, windows; painting, flooring, and building fixtures; and all equipment including chlorine contact tank, mixers, RAS/WAS pump, chemical storage and pumping systems, aeration blower with enclosure, coarse bubble diffusers, modify clarifier No. 2 to add aeration for sludge storage, ultrasonic flow meters, process piping, gates, weirs, and valves; expansion joints, pipe hangers and supports; plumbing, heating, and ventilation; electrical wiring, conduits, controls, alarm and instrumentation systems; incidentals as required for complete working system and a full pollution control facility upgrade. Project has an expected duration of 480 days. A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. The contractor must comply with the Disadvantaged Business Enterprises (DBE) requirements contained in the CWSRF Supplementary Conditions. Question Deadline 10/09/2025 Bidder shall submit all questions about the meaning or intent of ths Bidding Documents to Engineer in writing. Interpretations or From considered necessary by Engineer fn response to such questions wifi be issued by Addenda deiivered to all registered pion holders; Questions received less than seven days priorto the datefar opening ofBids may not be answered.

Bid Results

Water / Sewer

$7,372,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

38

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
19
Bidding Soon
335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

162 Pittsfield Ave, Hartland, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.