BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated July 3, 2025

Demolition, site work, paving and new construction of a mixed-use development in Holden, Maine. Completed plans call for the demolition of a road / highway; for the construction of a road / highway; for site work for a road / highway; for paving for a road / highway; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

The work shall consist of the following; demolition of existing building and foundation, excavation and backfill, drainage, paving, foundation, lighting and electrical service, and construction of a 70-foot by 96-foot laminated wood arch building to contain approximately 3,300 cubic yards of material on Town owned property located at 570 Main Road, Holden, Maine. If you would like to visit the site please coordinate visits with the Town Manager, Ben Breadmore at 207-843-5151. Prospective bidders must register with Haley Ward for their bid to be considered. No Bid may be withdrawn for at least 60 days after receipt of Bids unless released by the Owner. Bids submitted without Bid Security and completed certification forms will not be considered. The successful Bidder shall perform the work and furnish a Performance and Payment Bond, each in the amount of 100% of the contract price with a corporate surety authorized to do business in the State of Maine and approved by the Owner. The Contractor shall guarantee all materials and equipment furnished and work performed for a period of one year from the date of substantial completion. The Performance Bond shall remain in full force and in effect through the guarantee period. The Town of Holden, Maine reserves the right to reject any or all Bids or to accept any Bid that it may deem to be in its best interests, as Owner, to accept.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$625,000.00

Public - City

Demolition, New Construction, Paving, Site Work

9

27

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
22
Bidding Soon
277
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

May 4, 2022

Project location map

570 Main Rd, Holden, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.