Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 12, 2022 at 8:00 PM
Updated May 15, 2026
Site work for a mixed-use development in Houlton, Maine. Completed plans call for site work for a educational facility.
RSU 29 is currently accepting proposals for a propane tank farm installation at Houlton Southside School in Houlton, Maine. The scope of the project will include supplying an anticipated connected load of two(2) propane boilers, as well as Dhw heater, second stage regulator, horizontal storage tanks, gas powered vaporizer, concrete pads and security fencing. All piping and underground piping, re-seeding and patching hot top areas disturbed by underground piping installation.
Post-Bid
Educational
$100,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2022
August 11, 2022
To Be Determined, Houlton, ME
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
