Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2025 at 7:00 PM

Updated May 15, 2026

Demolition and site work for a bridge / tunnel in Lewiston, Maine. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

The work for the LOWER CANAL BRIDGE DEMOLITION shall consist of, but not be limited to, the complete and satisfactory construction of installation of: - Bridge Removal (2) o Continental Mill Pedestrian Bridge o Miller/Weisman Pedestrian Bridge Work includes the removal of two (2) steel-beam pedestrian bridges spanning the Lower Canal. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated.

Award

Bridges / Tunnels

$55,975.00

Public - City

Demolition, Site Work

5

16

11

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
34
Bidding Soon
1,022
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed