BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2025 at 7:00 PM

Updated July 3, 2025

Demolition and site work for a bridge / tunnel in Lewiston, Maine. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

The work for the LOWER CANAL BRIDGE DEMOLITION shall consist of, but not be limited to, the complete and satisfactory construction of installation of: - Bridge Removal (2) o Continental Mill Pedestrian Bridge o Miller/Weisman Pedestrian Bridge Work includes the removal of two (2) steel-beam pedestrian bridges spanning the Lower Canal. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated.

Award

Bridges / Tunnels

$55,975.00

Public - City

Demolition, Site Work

5

16

11

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
22
Bidding Soon
730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.