Published January 20, 2022 at 7:00 PM
Updated July 3, 2025
Site work and new construction of a civil project in Mars Hill, Maine. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
As of 01/06/2022 This project has not been awarded. Construction of a new water treatment facility constructed of wood framing with vinyl siding, with a standing seam metal roof and installation of well pumps. The water treatment facility will be equipped with ancillary piping and chemical feed systems, VFDs, electrical, lighting, unit heaters, propane tanks and a exterior mounted emergency standby generator. The site work includes, grading, chain link fence and gates, site piping, and underground electrical service as shown on the design plans. The number of days to substantial completion is 180 and final completion is 210 days. The building foundation and water mains stubbed out above building slab elevation has been completed under Contract 1. Construction of a new water treatment facility on Antworth Lane on land owned by the Mars Hill & Blaine Water Company. The Work includes, but is not limited to, the following: 1. Water Treatment Building: a. Wood Framing with Vinyl Siding b. Standing seam metal roof c. Exterior and interior doors 2. Site work a. Grubbing (Clearing to be completed by Others) b. Grading c. Ditching d. Gravel driveway e. Fencing f. Generator and propane tank concrete pad g. Holding tank (tight tank) and dry well h. Site utilities not previously installed by others. 3. Concrete work: a. Propane tank pad, generator pad b. Door entrance pad and ramp c. Building foundation, slab by others prior to start of this contract 4. Electrical a. Lighting b. Power and conduit c. Underground power/controls conduit and associated equipment to wells from the treatment facility d. Buried electrical service e. Transformer f. VFDs g. Panels including: i. Relocation of electrical equipment temporarily mounted on the site to serve well TW-1 to be relocated to the facility electrical room. Refer to electrical drawings for details. 5. Mechanical/HVAC a. Unit heaters b. Floor drain c. Emergency Shower d. Louvers e. Duct work and fans f. Temperature Control 6. Process a. Disinfection of potable water piping inside the new facility b. Installation of pitless adapters on wells TW-1, 1A, TW-3, 3A c. Installation of submersible pumps in wells TW-1A, TW-3, TW-3A. i. Pull and reset pump for TW-1 and coordinate with pitless adapter install. d. Chemical feed pumps, day tanks, weigh scales, and associated piping and appurtenances including chemical injection nozzles. e. Water softener and GAC filter f. Ductile iron process piping and fittings g. Valves (Butterfly, Needle, Pressure relief, chemical feed equipment valves, check valves) h. Installation of 3/4 " sample line piping and appurtances to the chlorine analyzer and associated drain and vent piping. 7. Instrumentation and Control a. SCADA software and new computer hardware at the District office b. Programming of SCADA screens and controls for facility c. Furnish and install instruments and equipment noted in Division 13. d. The radio network infrastructure installation will be completed under a separate contract. 8. Startup, testing, and commissioning of the facility including demonstration of all process equipment, instrumentation, and controls functionality. 9. All related site work including trench excavation, groundwater dewatering, disposal of excess excavated materials, filter fabric, bedding, backfill, compaction, road/drive subbase, paving, load/seed and landscaping, chain linked fence and gates. 10. Other miscellaneous work shown in the Specifications for a complete and operational system
Award
Water / Sewer
$1,440,954.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2021
January 19, 2022
Antworth Ln, Mars Hill, ME
Related To This Project
Mars Hill, ME
Bid Date: Mar 05 2025
Mars Hill, ME
Bid Date: May 07 2025
Mars Hill, ME
--
Mars Hill, ME
Bid Date: Dec 20 2022
Lisbon Falls, ME
Bid Date: Jan 12 2022
West Gardiner, ME
Bid Date: Jan 19 2022
West Paris, ME
Bid Date: Jan 26 2022
Biddeford, ME
Bid Date: Jan 27 2022
Vassalboro, ME
Bid Date: Mar 09 2022
Bangor, ME
Bid Date: Mar 02 2022
Portland, ME
Bid Date: Mar 24 2022
Litchfield, ME
Bid Date: Mar 29 2022
North Anson, ME
Bid Date: Mar 31 2022
Auburn, ME
Bid Date: Jul 15 2020
Brewer, ME
Bid Date: Jun 17 2020
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.