Demolition, site work and new construction of a civil project in Mechanic Falls, Maine. Completed plans call for site work for a water / sewer project; and water / sewer project.

**As of March 17, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Work under this project includes, but is not limited to, provide and install a new recessed wet well mounted pump station within a new below grade concrete and wood framed constructed building structure at the Mechanic Falls Sanitary District Wastewater Treatment Plant with all materials, equipment, labor, and incidentals provided by the Contractor including all site work, demolition work, removal and relocation of existing garage structure, earthwork, ledge removal, backfill and compaction, cast-in-place concrete structures, wood framed building, main pump station equipment and controls, drain pump station equipment and controls, all associated process piping and supports, approximately 360 LF of 10" 0 DI force main piping, 1" 0 CTS PE process water piping and underground fiber option cable in a common trench; loam and seed, erosion control, temporary pumping, test pits, metals, electrical, SCADA system modifications, heating and ventilation, and all incidentals for the complete installation of a new main pump station at the Mechanic Falls Sanitary District Wastewater Treatment Plant. Bids are requested for the following Contract: Wastewater Treatment Plant Main Pump Station Replacement All further requirements regarding bid submittal, qualifications, procedures, and contract award are included in the Instructions to Bidders in the Bidding Documents. The project must comply with the Federal Build America, Buy America Act, the use of American Iron and Steel, Disadvantaged Business Enterprises requirements, all applicable Federal Requirements, and the Davis-Bacon Act regarding prevailing wage rates. Bids must be accompanied by a bid security of 5% of the maximum bid price in the form of a certified check or bid bond. Omissions, discrepancies, interpretations, and questions must be submitted in writing to the Engineer.

Bid Results

Water / Sewer

$4,309,125.00

Public - City

Demolition, New Construction, Site Work

45

27

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
9
Bidding Soon
569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 20, 2026

Project location map

56 Lewiston St, Mechanic Falls, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.